Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Manifestation Of Mine Pressure And Its Relations To Overlying Strata Movements

    By Z. C. Song

    [THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c

    Jan 1, 1982

  • SME-ICGCM
    Measurement Of Structural Deformation And Tilt During Subsidence

    By Revendra Awasthi

    The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi

    Jan 1, 1990

  • SME-ICGCM
    Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design

    By Peter Cain

    Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block

    Jan 1, 1993

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    Pressure Measurements in the Gob (27227c3c-951c-4108-ba5c-3b6e67d232fb)

    By H. Maleki

    Gob pressure measurements were made in a Western U. S. coal mine as part of a long-term program to evaluate cave progress and to determine the influence of geological discontinuities on caving conditi

    Jan 1, 1984

  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    State Of The Art Testing Of Powered Roof Supports

    By Robert C. Garson

    The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine

    Jan 1, 1982

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • SME-ICGCM
    Delineation Of Abandoned Workings With An In-Seam Seismic Method

    By I. Geldmacher

    In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide

    Jan 1, 1990

  • SME-ICGCM
    Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels

    By Andre Vervoort

    The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr

    Jan 1, 2000

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME-ICGCM
    Using Site Case Histories Of Multiple Seam Coal Mining To Advance Mine Design (a1a824d0-6082-498c-977a-2f43506db9fe)

    By John Ellenberger

    The nature of competition in the coal market tends to deplete the most favorable coal reserves first, and forces subsequent development of mines in more extreme ground conditions such as those associa

    Jan 1, 2003

  • SME-ICGCM
    Roof Bolting Application In Longwall Mining In Indonesia And Japan

    By Herryal Anwar

    The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that

    Jan 1, 1999

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface Structures

    By Yi You

    A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term

    Jan 1, 1997