Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Observations of Impacts to Pennsylvania's Interstate Highways by Longwall MiningBy Anthony Iannacchionc, Jessica Benner, Harold Miller, Megan Witkowski
"Longwall bituminous coal mining has been practiced in Pennsylvania since the 1970""s. Hundreds of longwall panels have been mined during the last 40 years but only 24 have actually undermined Pennsyl
Jan 1, 2010
-
Critical Roof Span Approach To Selection Of Proper Coal Mine SystemBy Antoni Kidybinski
Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls
Jan 1, 1982
-
Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep OverburdenBy Joe Wickline, Mark A. Van Dyke, Wen H. Su
"Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr
Jan 1, 2017
-
Crosshole Seismics: Applications In MiningBy Richard E. Thill
Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq
Jan 1, 1989
-
Development and Application of the TT Anti?Friction Washer for Use with Tensioned Roof Bolt SystemsBy Thomas A. Cook
The effectiveness of tensioned roof bolt systems has been well researched and documented over the years (Stankus, 1990, 1991, 1997; Guo, 1997; Denton, 2000; Su, 2007). Higher and more consistent inst
Jan 1, 2014
-
Ground Control Aspects of a Successful Underground Coal Mine Trial in Weak Strata in IndonesiaBy Andrew Lewis, Amarit Nitaramorn, Alexander Garcia, Peter Altounyan
"Indonesia is a major coal producer, the vast majority being sourced from opencast operations. Underground production to date has been constrained by unfavorable ground conditions and limited local ex
Jan 1, 2010
-
Gateroads Layout and Entry Support in a Western Longwall Coal Mine in ChinaBy WenFeng Li
Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We
Jan 1, 2013
-
Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCLBy Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan
"India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and
Jan 1, 2017
-
Investigating the Contributing Factors to Rib Fatalities Through Historical AnalysisBy Tristan H. Jones
Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m
Jan 1, 2014
-
Comparison of L-Band and X-Band Differential Interferometric Synthetic Aperture Radar for Mine Subsidence Monitoring in Central UtahBy Jessica M. Wempen, Michael K. McCarter
"Differential Interferometric Synthetic Aperture Radar (DlnSAR), a satellite-based remote sensing technique, has potential application for measuring mine subsidence on a regional scale with high spati
Jan 1, 2016
-
Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining HeightBy Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li
"Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft
Jan 1, 2015
-
Development of An Online User’s and Training Manual for LaModelBy Keith A. Heasley, Christopher R. Newman
"Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T
Jan 1, 2015
-
Application Research of 3D Laser Scanning Technology in Monitoring Subsidence Area of Coal MiningBy Feiya Xu, Syd S. Peng
"As a highly efficient and new surveying and mapping technique, 3D laser scanning technology has been gradually applied to surface subsidence monitoring in mining areas. 3D laser scanning technology w
Jan 1, 2018
-
Selection of Tunnel Support System by Using Multi Criteria Decision Making ToolsBy Kazem Orace, Navid Hosseini, Mehran Gholinejad
"Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t
Jan 1, 2010
-
The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar MinesBy Anthony (Sam) J. S. Spearing
Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o
Jan 1, 2013
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar MiningBy Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015
-
Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining AreaBy Andre Zingano
An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se
Jan 1, 2013
-
Estimation of the Intact Strength of Coal Using Indirect MethodsBy Mark Van Dyke, Gamal Rashed, Khaled Mohamed, Timothy Barton, Morgan Sears
"The unconfined compressive strength (UCS) of coal is an important parameter that controls the stability of coal ribs in underground mines. Estimation of the UCS of coal units composing the rib is req
Jan 1, 2018
-
Design of Roof Bolt Based Breaker Line Support in a Mechanised Depillaring PanelBy Sahendra Ram, Arnn Kr Singh, Dheeraj Kumar, Rajendra Singh
"Inherent existence of different rooms (openings) along the extraction line in a depillaring panel provides an easy path for the goaf to encroach the working area. Each of these openings in a mechaniz
Jan 1, 2016
-
Subsidence and Ground Deformation Prediction in North America-A Case Study and New Method DevelopmentsBy Karsten Zimmermann, Peter Cain
"To receive regulatory approval for a new coal mining operation in North America, extensive investigations of feasibility and potential environmental impacts, including ground deformations, are requir
Jan 1, 2016