Vibration and Structure Response from Dade County Quarry BlastingBy David Siskind, Mark Stagg
Vibrations from Dade County (Miami area) quarry blasting and structure responses were measured at 11 locations between February and April, 2000, and 10 homes were inspected to analyze the characterist
Jan 1, 2001
-
Determination of Blast Vibration Limits by Direct Strain MeasurementBy Adrian Moore, Alan Richards, Andrew Brodbeck
Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str
Feb 1, 2020
-
Exterior Explosive Model Evaluation for Application in Probabilistic Risk AssessmentBy Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson, Brian Somes
"To perform a probabilistic risk assessment (PRA), a method of quantifying the risks associated withinfrequent, high consequence events, consequence models that generate representative estimates of hu
Jan 1, 2017
-
Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration MonitorsBy William. J. Birch, Catherine. E. Johnson, Robert Farnfield
Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de
Feb 6, 2023
-
Vibration Control Using a Smartphone- Accuracy, Validation and PotentialitiesBy Francisco Sena Leite, Vinicius Miranda
Mine blasting is directly associated with ground vibration. If these affect critical structures (buildings pit walls, etc.) they must be mitigated to reduce the environment and social impacts. Vibrati
Jan 1, 2018
-
Blasting For A Lokotrack SystemBy Roger L. Keller
Cautious, productive blasting is employed in the adaptation of a mobile crushing system extending into a highway through cut. In Hong Kong's final chapter of infrastructure development in preparation
Jan 1, 1998
-
Firing Reliability of Electronic DetonatorsElectronic detonators are receiving increasing acceptance in the blasting industry. Electronic detonators offer several distinctive features over electric and non-el (shock tube) detonators including
Jan 1, 2010
-
The Renovation of Theodore Roosevelt DamBy Tom Hanke, Joe Strobbe
The 80 year old Theodore Roosevelt Dam built in a scenic canyon near Globe, Arizona is currently undergoing a major renovation. The old stone dam, built by hundreds of skilled stonemasons, is being co
Jan 1, 1993
-
Emulsion Breakers for Waste ExplosivesBy Maja Franjic, Ian Tolliday, Chris Collins, James Wiltshire
Ammonium Nitrate Emulsions (ANE) are a large segment of the explosives market for the mining industry. These emulsions are generally designed to be very stable but when breakdown does occur, removal o
Jan 21, 2025
-
A New Day for DynamiteBy Scott E. Winston, Spencer C. Watson
Dynamite is a generic term for a variety of high explosive formulations containing a blend of liquid and solid nitrate esters co-mixed with solid oxidizers and carbonaceous fuels. Dynamites can be div
Jan 1, 1985
-
Suggestions for Successful Cut BlastingBlasting in a development heading or breasting operations starts from a cut. The void created by the cut provides a free face for the remainder of the round. It is the most critical part of the round
Jan 1, 1995
-
Vibration Criteria for Landmark StructuresBy John R. Schuring, Walter Konon
The 2.0 in./sec. peak particle velocity criterion traditionally used to protect structures from blast induced vibration damage is non-conservative for landmark structures. Various factors which must b
Jan 1, 1984
-
Prediction of Ground Vibrations Using Neural Network in a Peruvian MineBy Pavel A. Torres, Darwin Torres, Sandro Huaman
Given the limited efficiency of blast-induced ground vibrations prediction empirical models, due to the complex geological system from a Peruvian mine. An artificial neural network was built in order
Feb 1, 2020
-
The Mechanism of Blasting with Linear ChargeBy Feng Shuyu Yang Nianhua
According to the results of high speed photography tests, particle velocity measurement tests and the digital calculation with TP2 software, the shape of shock wave, the declined laws of the shock wav
Jan 1, 1997
-
Proactive Controls for Highwall StabilityBy Trevor Ames
Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl
Jan 1, 2015
-
Design Criteria for Sequential BlastingBy A B. Andrews
The use of sequential blasting techniques that combine surface and in-thehole delays has provided blasters with increased flexibility in blast design to promote good rock fragmentation and displacemen
Jan 1, 1981
-
Controlled Blasting for Underground MiningThe most common method for identifying the potential for blast damage is the peak particle velocity. But this can depend on many factors such as the type of blast, explosive, confinement, timing and t
Jan 1, 1987
-
Dugout Blasting for Livestock WaterBy Mike Cammack
Western South Dakota is predominately an agricultural area, with exception of the mining and timber industries in the Black Hills region. With precipitation rates averaging below fifteen inches per ye
Jan 1, 1993
-
The Use of Electronic Detonators to Control Air BlastBy Andy Hudson, Stuart Brashear, David Lilly
Because of greatly increased timing accuracy, electronic detonator systems are a well-known and widely accepted major tool to control and reduce ground vibration. At a Southeastern quarry the authors
Jan 1, 2009
-
Targets for Blast Fragmentation ModelsBy J P. Tidman
The problem of blasting fragmentation has received a good deal of attention in recent years. Progress by the scientific method requires a good set of experimental data as a benchmark to test models. R
Jan 1, 1991