Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Application of Numerical Modelling to Examine Priming of Bulk Explosives

    Numerical modelling was used to examine priming of bulk commercial explosives. Data for the HOM equation of state were calculated using a representative chemical composition, while Forest Fire model d

    Jan 1, 2002

  • ISEE
    Journal: Safety Talk / Every Number Tells A Story

    By Paul Downing

    A typical day for a blasting company includes what seems to be an infinite list of tasks dealing with numbers. Whether determining the exact amount of explosives material in inventory, the number of h

    Jan 1, 2008

  • ISEE
    Planning for Optimum Dragline Performance

    By Mark A. Williams, James D. Humphrey

    Without question, draglines are one if not the most effective tools available to the surface mining industry for overburden handling. With few moving parts and a two- or threeman crew, this machine si

    Jan 1, 1990

  • ISEE
    Momentum Theory – A New Calculation of Blast Design and Assessment of Blast Vibrations

    By Robert Boehnke, Bernd Mueller

    Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation

    Jan 1, 2003

  • ISEE
    Natural Causes vs. Blasting Damage (0f5bd837-c817-4297-aa85-2fe7a4624b9b)

    By Earl C. Hutchison, Wade C. Hutchison

    T 0 effectively evaluate property damage that is claimed to have been caused by blasting activities and in order to lay the proper foundation to build the best legal defense, identification of the act

    Jan 1, 1995

  • ISEE
    A Tiered Approach to Mitigating the Environmental Effects of Underwater Blasting

    By Thomas M. Keevin, Gregory L. Hempen

    "Natural resource agencies, under various regulatory authorities, are challenged with permitting underwater explosive use while at the same time protecting aquatic resources. Deciding on whether or no

    Jan 1, 1995

  • ISEE
    The Influence of Geology on Blasthole Deviation

    "Blasthole deviation is a frequent, well documented and undesirable occurrence in mining operations. It is caused by the drill string mechanics, operating variables and the 'interactionbetween the dri

    Jan 1, 1996

  • ISEE
    Critical Delay Timing in Multi-Level Mass Stope Blast Design

    By Dale Preece, Stephen Chung, Qian Liu

    Stoping is one of the widely adapted methods in underground mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sub- level in the ore zone and blasted ring by

    Jan 1, 2003

  • ISEE
    Super Cautious Contour Blasting Underground

    By Stig O. Olofsson

    The problem of overbreak in underground construction and mining is normally approached by a variety of smooth blasting methods. Numerous small diameter, low velocity explosives have been developed spe

    Jan 1, 1994

  • ISEE
    Digitally Integrating the Blast Design with Remote Wireless Electronic Blasting

    By Charles Pretorius

    Electronic Delay Detonators (EDDs) with remote wireless programming and initiation capabilities have been successfully used for almost two years now. This system has been used in blasts mainly in Sout

    Jan 1, 2005

  • ISEE
    Application of Non-Newtonian Fluid Mixture for Stemming Performance Optimization

    By Braden Lusk, Paul Sainato, Josh Calnan, Hiago Vasconcelos, Luis Felipe Marinho

    "Blasting and rock fragmentation is one the most important unit operations in mining. Since itsintroduction into the mine production cycle, mining has become more efficient in mineral production(Hartm

    Jan 1, 2016

  • ISEE
    Thermal Decomposition of Anfo at Low Heating Rates

    By E. Contestabile, R. von Rosen, R. Guilbeault, R. Fouchard, P. Lightfoot

    In August 1998, a truck loaded with 18 tons of blasting explosives, including over 13 tons of ANFO, left the road near Walden, Ontario. The crash caused a fire; approximately 30 minutes later a large

    Jan 1, 2003

  • ISEE
    The Effect of Fragmentation on Loader Productivity (95e8fe1a-7252-44f9-b557-30f0369d4449)

    By Michael D. McGill, Jeff Freadrich

    There are many factors which affect the productivity of a front end loader. One of the most obvious is the characteristics of the material being mined. Characteristics such as size distribution, swell

    Jan 1, 1994

  • ISEE
    The Development of Compact Slurry Explosive Blasting System for Tunneling

    By Junya Tokita

    In Japan, packaged explosives have traditionally been used as the most common explosive for tunneling. Recently, some blasting systems such as ANFO with a kettle loader and emulsion explosives with a

    Jan 1, 2005

  • ISEE
    Subdrill – The Underutilised Blasting Parameter

    By Stephen Mansfield

    In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable

  • ISEE
    Calculating Blasting Effects to Nearby Underground Pipelines

    By Janice K. Means

    The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting

    Jan 1, 1992

  • ISEE
    Choosing the Correct Bulk Loading Equipment Can Help Optimize Your Blasting Program

    By R Tom Watts

    The blasting industry has changed more in the last five years than in any period to date. The equipment utilized to load boreholes has changed in response to more precise blasting products and program

    Jan 1, 2000

  • ISEE
    Human Response to Ground Vibration and Air-Overpressure Due to Blasting in Opencast Non-Coal Mines in India: A Case Study

    By M. Ramulu, A. K. Chakraborty, P. B. Sahu, C. Bandopadhyay, P. B. Choudhury

    Human response to blast induced vibration and air overpressure is an unsolved problem that accompanies excavation process in mining. Pre-assessment and understanding of annoyance due to production bla

    Jan 1, 2004

  • ISEE
    Adapting Quarry Ace for Beginners to Profile Bench Faces and Optimize Front Row Burden Controls

    By Brian Gar Wingfield

    "The introduction of the QuarryMan laser profile system in 1987, along with the development of the corresponding 3-D software, gave a qualified operator pertinent information about dimensions of quarr

    Jan 1, 1992

  • ISEE
    Tunnel blast drill hole surveying – Benefits and Methodologies

    By G. Adderley, A. Wetherelt

    The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-

    Jan 1, 2009