Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall ConstructionBy Mamdouh Hamza
The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde
Jan 1, 2002
-
Innovative Micropile Retrofi t of an Existing StructureBy Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman
"Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example
Jan 1, 2008
-
Soil Improvement Using Gravel-Sand Columns for a Highway Project in GermanyBy Schmitz Stefan, Stephan Jee-Sun
"Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy
Jan 1, 2015
-
Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic LoadsBy P. Kiruthika, A. Murali Krishna
Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp
Sep 1, 2022
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction ContractsBy Steven M. Henderson, Zachary D. Jones
The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on
Jan 1, 2017
-
Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By WasteBy Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei
Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml
Nov 1, 2022
-
Utilizing Drones to Improve Project WorkflowsBy Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Behaviour Of Piled Raft- Importance Of Observational StudyBy Abhirami B., V. Balakumar
Piled raft foundation system is an intelligent geotechnical concept, developed towards reducing the settlement of the raft and the footings by providing pile elements below the raft or footings, as th
Nov 1, 2022
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Study on a Method for Determining the Proper Cover Soil Depth for Cement Ground Improvement in Cold RegionBy Masahiko Yamaki, Takahiro Yamanashi, Hijiri Hashimoto, Hirochika Hayashi
"In this study, the authors used heat conduction analysis with the aim of quantitatively evaluating whether treating improved ground with cover soil is an effective measure for maintaining strength de
Jan 1, 2015
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. IntroductionBy Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Anchored Double-Tier Retaining Walls on Sloping EmbankmentBy Chu E. Ho, Paul Napoli
A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia
Jan 1, 2019
-
Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in RomeBy Bruno Vingiani, Alessandro Bertero
"The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t
Jan 1, 1900
-
Indicator Pile Program at Port of Oakland, CaliforniaBy Partha Sircar
"For Berth 22 modifications at the Port of Oakland, nearly 600 octagonal 24-inch ‘diameter’ precast-prestressed concrete piles were driven, some piles over 160 feet long. Prior to production pile driv
Jan 1, 2015
-
Analytical Method of Stone Columns Compared with an Analysis as Per Rowe Dilatancy TheoryBy Abhijit Saha
"Two analytical closed-form elastic-rigid-plastic solution methods to predict the rigid foundation behaviour on stone-column reinforced soil are compared, both of which takes into account the stone ma
Jan 1, 2015
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019