Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • CIM
    Surface mining collaborative research initiatives: A progress report

    By Ian R. Muirhead

    Over the past year or so, a number of mining companies have been meeting to examine the role of research in surface mining and, in particular, how to establish a collaborative research effort for the

    Jan 1, 1996

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    IsaMill Fine Grinding Technology and its Industrial Applications at Mount Isa Mines

    By Michael Young, Peter Allum, Mingwei Gao

    "Tough economical conditions and high grade but fine-grained ore processing have forced the mining industry to look for more efficient processes. Isa Mill Technology for ultra-fine and fine grinding i

    Jan 1, 2002

  • CIM
    Recovery of Lanthanides from Apatite Phosphogypsum

    By Cz. Mora, A. Pawelczyk, D. Hreniak, P. Nowak, A. Dyonizy, S. Strek, W. Strek, K. Grabas, A. Ostrowski

    Globalization and a growing demand for limited raw material resources have forced changes in the approach to the supply chain. This is particularly true in the case of rare earths, which are regarded

    Jan 1, 2014

  • CIM
    The Application of Mining, Minerals and Sustainable Development?s ?Seven Questions of Sustainability? to a Planning Process in Alberta

    By Don Peel

    Mineral aggregate, the most widely used mineral resource globally, has attracted little academic or public interest. Of all mining developments, the aggregate resource is seldom factored into resource

    May 1, 2004

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Secondary Recovery of Bitumen Using Jameson Downcomers

    By R. Siy, O. Neiman, B. Hilscher

    "A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty

    Jan 1, 2012

  • CIM
    Process Control... And Where Are We Going?

    By Brian Flintoff

    "When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first

    Jan 1, 1998

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    Ingénierie de la maintenance, de la conception à l?exploitation

    By Turcotte. Yves-Laurent

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Using Millmapper ™ to Reduce Milling Costs and Improve Performance

    By Tom Gabardi, Peter Clarke

    "MillMapperTM is a new 3D laser scanning technology that has only recently been introduced into the North American mining industry. It enables mill operators to gain a much more complete understanding

    Jan 1, 2012

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    The Kumtor Gold Mill Start Up and Start up Challenges

    By John Kazakoff, Andrew Mortimore

    "Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the

    Jan 1, 1999

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003

  • CIM
    Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine

    The uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio

    May 1, 2007

  • CIM
    Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and Muscovite

    By Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas

    "Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr

    Jan 1, 2003