Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Open the Matrices Wear and Self-Sharpening of Impregnated Diamond Drill Bits

    By Hll J. K, Zhang Y. G

    The wear mechanisms of impregnated diamond drill bit matrices are complex and believed to be the key point in solving drill bit self-sharpening problems. A method has been developed to find the chan

    Jan 1, 1989

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986

  • AUSIMM
    Evaluation of Grouted Thread Bar Bolt Performance by Means of Pull Out Test in Deep Ore Zone Mine PT Freeport Indonesia

    By L Rachmad

    Freeport IndonesiaÆs Deep Ore Zone (DOZ) mine is the new underground block caving mine within the East Ertsberg Skarn System (EESS) deposit which started production in mid-2000. The DOZ will produce 2

    Jan 1, 2002

  • AUSIMM
    The Exploration History and Geology of the Polymetallic Reward Deposit, Mt Windsor Volcanic Belt, North Queensland

    By Laing W. P, Neill D. M, O&apos

    The Reward polymetallic massive sulphide deposit occurs 35 km south of Charters Towers, adjacent to the Highway gold deposit (Fig. 1). It is hosted within rhyolitic lavas and interlayered volcanicl

    Jan 1, 1989

  • AUSIMM
    Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st Century

    By W Roy

    When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation

    Jan 1, 2006

  • AUSIMM
    Discovery, Geology and Metal Zoning of the Nickel Rim Depth Deposit, Sudbury, Canada

    The Nickel Rim Depth Cu-Ni-PGE deposit, discovered by Falconbridge Limited in 1993, illustrates several trends in exploration in the Sudbury area. Recent discoveries tend to be deep, high grade, foo

    Jan 1, 1996

  • AUSIMM
    Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant

    By B Newcombe

    From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m

    Sep 5, 2011

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water Impacts

    By C Wels

    Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a

    Jan 1, 2003

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Exploration History of the Mbalam Iron Ore Project

    By S E. Thornett, P L. Kitto, R S. Longley

    "The Mbalam Iron Ore Project covers mineralisation in two areas of metamorphosed hematitic banded iron formation (itabirite) in the north-west Congo Craton; namely at Mbarga in south-east Cameroon and

    Aug 12, 2013

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Evaluation of the environmental benefits of using a conveyor belt mining system in an open pit mine

    By G P. S Resende, D E. G Oliveira, E A. S Baeta, T F. Bravin

    There is currently in the mining industry, as well as in other industries, a movement seeking to increase investments in decarbonisation processes to help combat global warming. Among some initiatives

    Sep 18, 2023

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    A Review of the Acid Rock Drainage Potential and Hydrological Implications of Selectively-Placed Waste Rock at a Gold Mine in NSW, Australia

    By J Jeffrey, G W. Wilson, L Gilbert, C

    Prior to the commencement of mining, the acid rock drainage (ARD) potential of the waste rock to be produced by an open cut mining operation is assessed by a variety of techniques carried out on drill

    Jan 1, 2003

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Presidential Address, 1967 Overseas Investment in the Australian Mining Industry

    There was a time, in the memory of some here tonight, when the annual meeting of The Institute was a nostalgic occasion. Often, in the 1920s, there was comment on the decline of Australian mining and

    Jan 1, 1967