Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016
-
Driven Piles For New Pacific Northwest Baseball Park - IntroductionBy Thomas M. Gurtowski
The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th
Jan 1, 1998
-
MLA 22-87 - Mineral Resources Of The Skedaddle Study Area, Lassen County, California And Washoe County, Nevada ? SummaryBy Steven R. Munts
In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 39,420 acres of the 60,960-acre Skedaddle Wilderness Study Area in order to evaluate its identified mine
Jan 1, 1987
-
Energy Conservation in Non-Ferrous Industries by the Substitution of Natural GasBy S. V. Cherty
The utilization of natural gas in non-ferrous industries during smelting and refining stages of copper , aluminum, zinc and lead was studied. The total amount of nonelectrical energy consumed in the p
Jan 1, 1993
-
Caving, Seismicity, and Mine Design in Four Utah MinesBy Hamid Maleki
Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in
Jan 1, 2006
-
In-Cab Noise Reduction On An Air-Rotary Drill RigBy R. J. Matetic, David S. Yantek, David K. Ingram
The National Institute for Occupational Safety and Health (NIOSH) has investigated engineering noise controls to reduce sound levels in cabs on air-rotary drill rigs. A recent investigation revealed t
-
Pit Water Management in a Mine Planning Cycle, Olympic Dam Case StudyBy D Barclay, S Mercer, S Wright
Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I
Jan 1, 2009
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
RI 7576 Structural Deformation Of Green River Oil Shale As It Relates To In Situ RetortingBy P. R. Tisot
Structural response and/or deformation was determined for each of four different grade Green River oil shales (27.0-, 34.5-, 45.5-, and 63.5-gal/ton) as they were heated in an inert atmosphere, under
Jan 1, 1971
-
Some Notes on the Geology of Stannary Hills, North QueenslandTHE following notes were accumulated during the years 1905 to 1911, when the writer was employed at Stannary Hills. The writer's duty took him over the underground workings daily. In odd moments
Jan 1, 1918
-
Explosives utilization at aWitwatersrand gold mineBy M. Gaula
"Gold bearing deposits of the Witwatersrand basin are generally less than 2m thick and require conventional narrow-reef mining methods for extraction and employ explosives as a means of rock breaking.
Jan 1, 2015
-
Innovative Retaining Wall with Jet Grout for New Metro Tunnel Underneath Amsterdam Central StationBy B. J. Schat, A. W. O. Bots, O. S. Langhorst
Amsterdam City Council is building a new metro line, the North–South Line. The line passes under Amsterdam Central Station (a listed building) about 18m below street level. The retaining wall that has
Jan 1, 2007
-
Fault Swarms in the Greta Coal Seam, New South WalesBy Burns K. L
Keyboard patterns of hundreds of minor faults with vertical displacements of 3 mm to 2 m occur within the Greta coal seam and cause serious mining problems in collieries. Many of the faults are concen
Jan 1, 1978
-
Pulsed Power Breaking-Up Technology For Resistant Gold-Containing Ores And Beneficiation ProductsBy Valentine A. Chanturiya
The aim of this paper is basically to show progress in the study of nanosecond processes involved in the disintegration and breaking-up of mineral complexes with fine noble metals. We studied the infl
Jan 1, 2006
-
Institute of Metals Division - Beta Phase Parameters in the System Ti-V-MoBy Jack L. Taylor
As expected from similar crystal structures and favorable atomic size factors, titanium, vanadium, and molybdenum are completely soluble in one another above the transformation temperature of titanium
Jan 1, 1957
-
Reactions in the Cryolite-Silica SystemSilica reacts with cryolite at 1010°C in two stages. The first stage is the formation of a sodium aluminosilicate of composition consistent with the mineral jadeite (Na20.AI20s.4Si02). The format
Jan 1, 1972
-
Relationship between the clay fabric of roof shales and roof collapse in mines of the Herrin cod, southern IllinoisBy Theresa M. Bodus
The strength of roof shales is, in part, a function of the preferred orientation of clay minerals within them. Therefore, analysis of clay fabric under both air-dried and hydrated conditions should be
Jan 1, 1989
-
Minimising Crest Loss by Eliminating Surface Dilation Due to PresplittingIn most mines using presplitting the final excavated wall shows a zone of damage just below the crest and well defined presplit half barrels. The crest damage (surface dilation) zone varies and is add
May 1, 2010
-
Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators (3c055ade-7146-4060-a860-4133718a0454)By Michael S. Wieland
This report focuses on the U.S. Bureau of Mines research regarding desensitization and malfunction of delay detonators and cap-sensitive explosives. Delay blasting in underground coal generates tremen
Jan 1, 1992
-
IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.By G. J. Colaizzi
The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling
Jan 1, 1980