Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blasting in the New Mellinnium: Safety and CredibilityA Recipe for SuccessBy Steve Dillingham
In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov
Jan 1, 2003
-
Institute of Politics Discusses MineralsBy AIME AIME
AT Williams College, in the quaint old New England town where people still go to the post office for their mail, an interesting institution has come into being as one of the aftermaths of the peace co
Jan 1, 1926
-
Design Considerations for Mine Waste Management at the Meadowbank Gold ProjectBy Cameron J. Clayton
Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec
May 1, 2004
-
World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel SmeltingBy B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto
The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart
Jan 1, 2014
-
Effect of Biological Gas Generation on Oil Sand Fine TailingsBy C. Guo
The Mildred Lake Settling Basin (MLSB) is the largest disposal site for mature fine tailings (MFT) at the Syncrude Canada Ltd oil sands plant. Over the past years (since 1997), there has been a marked
Apr 1, 2005
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
IC 9324 Diesels In Underground Mines: Measurement And Control Of Particulate EmissionsBy Staff
The goal of the U.S. Bureau of Mines diesel engine research program is to reduce exhaust emissions from diesel-powered equipment used in underground mines. This research has led to significant advance
Jan 1, 1992
-
The Relations between Assarel-Medet JSC, Bulgaria, and the Municipality ?f Panagyurishte - A successful model for sustainable and socially responsible partnershipBy Lachezar Tsotsorkov
Corporate social responsibility Is a principal trend of the corporate strategy for sustainable development of Assarel-Medet JSC ? the largest Bulgarian company for open pit mining and ore processing
Aug 1, 2013
-
1994 Jackling Lecture - Mining Geostatistics - Forty Years Passed. What Lies Ahead?By Jean-Michel Rendu
That you are giving the Daniel C. Jackling award to me is a great personal honor. But more significantly, it is a recognition that geostatistics has come of age. And since I am considered by many as b
Jan 1, 1995
-
How the Mining Industry is Responding to Pressures for Change in the Management of Mine WasteBy Don Welch
Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc
May 1, 2010
-
Applying Human Factors Engineering To Mining SystemsBy Craig Hartley
? A helper stands beside a continuous miner as the operator is at the controls. The operator means to push the stop button but hits the drum rotation start button by mistake. The drum begins to turn a
Jan 1, 1983
-
Recent Investigations on the Nature, Preparation, Storage, and Coking of Typical Coals from the Sydney Area, Nova ScotiaBy R. E. Gilmore
Introduction The Sydney coal-field extends for a distance of thirty miles along the northeastern coast of Cape Breton island. At a central focal point at the tip of the south arm of Sydney harbour, s
Jan 1, 1933
-
Mine Evaluation and Investment AnalysisBy Donald W. Gentry
This section deals with one of the most fascinating aspects of mining the evaluation of mine investment opportunities. Be-fore proceeding further, it is important to clarify the meaning of some fundam
Jan 1, 2008
-
Cyclone modelling: A review of present technologyBy L. R. Plitt, A. A. Turak, B. C. Flintoff
"Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only
Jan 1, 1987
-
Embedding Sustainability into Environmental and Social Impact AssessmentsBy Louise Pearce
?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope
May 1, 2011
-
IC 9472 - Wearing Hearing Protection Properly: A 3-D Training Aid For DrillersBy Edward A. Barrett, Roberta A. Calhoun
Introduction This Instructor’s Copy contains most of the information needed to use the Wearing Hearing Protection Properly 3-D training reel. It offers practical suggestions on how to use the r
Jan 11, 2004
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
The Upgrading of Primary Gold Gravity ConcentratesBy Bryn Harris, Liming Huang, Andre Laplante
"This paper reviews flowsheets generally used in gold rooms to upgrade primary gravity concentrates particularly those of Knelsons. It is concluded that even for small operations, which treat between
Jan 1, 1999