Search Documents

  • SME
    Energy And Environmental Policy: Two Sides Of The Same Coin. The Approach Of Coal Extraction Industry For The Development Of Emissions Trading After 2012

    By K. Kavouridis

    The energy and climate protection policy of European Union (EU), and its Member States adopted in 2007 bridges security of supply, environmental protection and competitiveness. The objectives of the E

    Jan 1, 2008

  • SME
    Doe Run?s Sustainable Mining Operations Focused On Managing Lifecycle Of Lead

    By Jerry Pyatt

    Lead has been used by mankind since before the Egyptian pyramids were built. Its durability provides for a continuum of innovation. As the largest integrated lead producer in the Western Hemisphere, T

    Jan 1, 2008

  • CIM
    Measuring, Predicting and Managing Grinding Media Wear (5d9c40b7-b956-4f22-a404-50b6660acf1b)

    In 2009 Newmont Mining Corporation?s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t

    Jan 1, 2012

  • AUSIMM
    Education and the Role of Geotechnical Professionals in the Mining Industry

    The Australian mining industry faces skills shortages across a broad spectrum of disciplines and levels, as it enters another major growth phase. Critical amongst the areas of most significant shortag

    Nov 25, 2010

  • NIOSH
    IC 7743 Mining Methods And Costs At The Morning Mine, American Smelting & Refining Co., Shoshone County, Idaho - Introduction And Summary

    By John R. Reynolds

    This paper describes mining and milling methods of the American Smelting & Refining Co. at the Morning mine in the Mullan area of the Coeur d'Alene mining region in Idaho and is one of a series o

    Jan 1, 1956

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • NIOSH
    OFR-52-81 Wallrock Reactions To Mining Beyond A Preconditioned Zone At The Star Mine, Burke, Idaho

    By Wilson Blake

    Rock preconditioning in advance of mining was shown to be an effective means of rock-burst control based on the results of a field demonstration carried out on the 7700 level of the Hecla Mining Compa

    Jan 1, 1980

  • NIOSH
    IC 9142 Bureau Of Mines Cost Estimating System Handbook (In Two Parts) 1. Surface And Underground Mining

    This Bureau of Mines report and its companion report (Information Circular 9143) have been prepared to assist in the preparation of prefeasibility type estimates for capital and operating costs of min

    Jan 1, 1987

  • NIOSH
    OFR-13-82 Engineering Property Changes And Environmental Effects On Coal Mines Wastes Due To Slaking

    Fresh coal refuse was sampled at 21 US mines. Five of the sites were drilled, sampled and tested more extensively. Field tests included Standard Penetration tests, and in-situ density determinations.

    Jan 1, 1981

  • CIM
    Maintenance, Metallurgy and Mining

    By C. W. Taylor, F. L. Martin

    "THE DICTIONARY defines Metallurgy as the ""science or art of separating metals from their ores and refining them for use"". In these days, however, such a definition is not detailed enough.The modern

    Jan 1, 1960

  • NIOSH
    IC 7641 Industrial Minerals Of The Pacific Northwest ? Summary

    By A. J. Kauffman

    This inventory of the industrial mineral resources of the Pacific Northwest indicates that each of the States comprising this great region annually produces nonmetallic materials valued at mans millio

    Jan 1, 1952

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • CIM
    History of Development and Organization of Support Services For the Asbestos Hill Mine

    By S. A. Luciani

    "In 1957, an asbestos orebody was discovered in the northern sector of the Ungava Peninsula of the Province of Quebec, an area now identified as Asbestos Hill. The deposit is situated on a plateau 170

    Jan 1, 1976

  • SAIMM
    Design of Merensky Reef Crush Pillars

    By B. P. Watson

    The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl

    Jan 1, 2010

  • SME
    Rock Quality Alteration Surrounding Drifts And An In Situ Leaching Design Using Underground Workings

    By J. L. Ellenberger

    The U.S. Bureau of Mines has cooperated with Cyprus Casa Grande Corporation Cyprus Casa Grande Mine, Cas a Grande, Arizona, since 1988 to assess the hydrology of an in situ leaching test facility. Thi

    Jan 1, 1994

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • TMS
    An Investigation On The High-Mg-Content Slag In Jinchuan Nickel Flash Smelting Furnace

    By Wang Zhi

    High-Mg-content concentrates are usually treated in Jinchuan flash smelting Furnace. Because the viscosities of high-Mg-content slag is very high, the operation of flash smelting becomes very difficul

    Jan 1, 2003

  • NIOSH
    OFR-8-75 One-Hour Self-Rescue Breathing Apparatus - Summary

    By Yi-Shen Li

    This report has been prepared by Lockheed Missiles & Space Company, Inc. (LMSC), under United States Bureau of Mines Contract No. H0220040 dated 21 June 1972 for the design, development, fabrication,

    Jan 1, 1974

  • CIM
    Au L3-edge XANES Analyses for spr-Au/Al2O3 Catalyst

    By S. Nagamatsu

    Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,

    Oct 1, 2003