Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Determination of Load Transfer Characteristics of Gloved Resin Bolts from Laboratory and In Situ Field Testing

    By Dion Pastars

    Resin based grouts are the main form of rock bolt anchorage in the underground coal industry in Australia and New Zealand. To be effective, the system requires the mixing of the catalyst and mastic co

    Jan 1, 2005

  • SME-ICGCM
    A System to Provide Early Warning on Impending Goaf

    By Gift Makusha

    Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa

    Jan 1, 2005

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone Mines

    By Simon H. Prassetyo

    Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre

    Jan 1, 2011

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Monitoring Railroad Response To Mining Subsidence And Assessment Of Subsidence Effects On On Railroad - A Case Study

    By Yi Luo

    The responses of a section of railroad to ground subsidence process was monitored as it was undermined by a longwall panel. The subsidence data collected and the observations made through this monitor

    Jan 1, 1994

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Numerical Modeling Of Longwalls In Deep Coal Mines

    By Salah Badr

    Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar

    Jan 1, 2003

  • SME-ICGCM
    Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)

    By S. I. Al-Ameen

    Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes

    Jan 1, 1992

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    Definition of Ultra-close Multiple-seams and its Ground Pressure Behavior

    By Baisheng Zhang

    The definition of Ultra-close multiple seams as defined by the floor disturbance depth, h, due to mining in the upper seam is proposed: it refers to those coal seams that are spaced very closely, i.e.

    Jan 1, 2005

  • SME-ICGCM
    Some Structural Aspects Of Designing The Shield Supports

    By S. S. Peng

    This paper presents a convenient way for the preliminary design of the shield supports. The locus equations which are applicable for all kids of shield supports are derived. These equations facilitate

    Jan 1, 1982

  • SME-ICGCM
    Surface Ground Movements Over Longwall Mining In The Pittsburgh Seam

    By A. Wahab Khair

    This paper presents an analysis of surface ground movements recorded from two longwall mines in Northern West Virginia which operate in the Pittsburgh Seam. The instrumentation areas consisted of four

    Jan 1, 1988

  • SME-ICGCM
    Subsidence Studies In Thick And Steep Coal Seam Mining

    By M. Y. Fisekci

    This paper concentrates on subsidence measurements, applied over the thick and steep seam mining in the Rocky Mountains Region of Western Canada. The studies to date indicate that two new subsidence m

    Jan 1, 1981

  • SME-ICGCM
    Longwall Recovery Utilizing The Open Entry Method And Various Cement-Concrete Supports

    By E. Bauer

    During 1987 and 1988, the Eighty Four Complex Mine of BethEnergy Mines, Inc. used the open entry longwall recovery method to recover one partial and three complete longwall faces. Various cement- conc

    Jan 1, 1988

  • SME-ICGCM
    Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving Mining

    By Wenbing Guo

    Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and

    Jan 1, 2011

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993