Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines

    By Morgan Sears

    The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca

    Jan 1, 2013

  • SME-ICGCM
    Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal Mines

    By Yunqing Zhang

    Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co

    Jan 1, 2004

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Ground Control Monitoring of Retreat Room-and-Pillar Mine in Central Appalachia

    By William J. Conrad, Ryan J. Molka, Erik C. Westman

    "In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian mine. The program consisted of several monitoring methods including

    Jan 1, 2016

  • SME-ICGCM
    Performance Characteristics for Large Sections of Welded Wire Screen With Multiple Pull Patterns

    By Timothy J. Matthews, Timothy J. Batchler, Ted M. Klemetti

    "From 2011–2016, there were 1,511 documented injuries, including 7 fatalities, from ground falls in underground coal mines in the United States. The majority of these ground-fall injuries were not cau

    Jan 1, 2018

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian Conditions

    By Mark Colwell

    This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was

    Jan 1, 1999

  • SME-ICGCM
    An Overview Of Bureau Of Mines Ground Control Research

    By John M. Karhnak

    The Bureau of Mines has a long history of research in Ground Control. For many years, this work was done at Bureau facilities by Bureau researchers. As the tiles changed, however, the area of research

    Jan 1, 1981

  • SME-ICGCM
    A Roof Model and Its Application in Solid Backfilling Mining

    By Meng Xiao, Peng Huang, Lizin Lan, Feng Ju, Shuai Guo

    "Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process o

    Jan 1, 2016

  • SME-ICGCM
    Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof Bolters

    By Eric Keller, Jamal Rostami, Wenpeng Liu

    "Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o

    Jan 1, 2016

  • SME-ICGCM
    Utilization Of Polymer Grid Structures In Shield Recovery Operations

    By Brian E. Travis

    Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed

    Jan 1, 1993

  • SME-ICGCM
    Utilization of the OSI Underground System's Tandem Anchor to Improve the Weak Roof's Stability of Underground Openings

    By Tom Blevins, Roland Walker, Jinsheng Chen

    "The Dywidag-Systems International DSI Tandem Anchor bolt, with an improved expansion shell-washer design, can substantially reduce potential entry roof falls caused by twisted or deformed expansion s

    Jan 1, 2010

  • SME-ICGCM
    Rock Characterization Using Time - Series Classification Algorithms

    By Soheil Bahrampour

    Development of measurement while drilling (MWD) systems for ground control applications in mining applications has recently been an active research topic. The main goal is to utilize the drilling info

    Jan 1, 2014

  • SME-ICGCM
    Development of the 3D Numerical Modeling of Roof Bolts for Studying the Bolt/Rock Interaction

    By WenFeng Li

    A 3D roof bolt model with the consideration of rebar, resin, bearing plate, and resin/rock interface was developed for studying the bolt/rock interactions of the tensioned and fully-grouted resin bolt

    Jan 1, 2014

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    Mechanism and Prediction of Ground Surface Subsidence Due to Multiple-Seam Longwall Mining

    By Gang Ren, Behrooz Ghabraie

    "Observational data suggest that the ground surface subsidence profile from multiple-seam longwall mining is rather different from that of single seam. Despite the increase of coal production from mul

    Jan 1, 2016

  • SME-ICGCM
    Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)

    By Brian White

    Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p

    Jan 1, 2002