Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reconciliation Wars — Who’s Data Is Right?By J. Best, K. Gallant
This paper explores the age-old concept of mine-mill reconciliation from a new perspective. Advances in reconciliation processes have been slow to materialize because in the quest for “rightness”, eng
Jan 1, 2004
-
Design Considerations For A High Tonnage Counter Current Decantation (CCD) Thickener PlantBy D. Anthony, R. A. Williams, R. Raponi
Barrick Gold Corporation in conjunction with SNC Lavalin Engineers and Constructors have developed basic engineering design for counter current decantation thickener (CCD) plants capable of processing
Jan 1, 2002
-
Bureau Of Mines Research In In-Situ Leaching And Borehole (Or Slurry) MiningBy James J. Olson
Most of the projects summarized in this paper are funded under the Bureau's Advancing Metal-Nonmetal Mining Technology program and are part of the in situ mining subprogram coordinated at the Twi
Jan 1, 1977
-
Improving Conveyor Transfer Point Performance in Hard Rock Mines (3df8afc1-5943-4b67-9bd9-6a87144e0c1e)By R. Shields
"Hard rock mines move large volumes of material, which can cause the conveyors that are essential to this movement to suffer lots of problems, including carryback, spillage, dust and belt wander. Many
Jan 11, 2017
-
Computer Simulation and Optimization of Mineral Processing Plants Three Case StudiesBy J. Mark Richardson
The use of an integrated software package to simulate and optimize the performance of mineral processing circuits is illustrated by three examples. Each represents application of the software and asso
Jan 1, 1990
-
Natural Versus Mining-Related Water Quality Degradation to Tributaries Draining Mount Moly, Silverton, ColoradoBy Winfield G. Wright, Philip L. Verplanck, Philip L. Hageman, Douglas B. Yager, Dana J. Bove, M. Alisa Mast
Geological, hydrological, and geochemical information synthesized in a Geographical Information System (GIS) for water and rock surrounding South and Middle Forks of Mineral Creek, northwest of Silver
Jan 1, 2000
-
Waneta expansion project: Penstock tunnelsBy Ben Roderds
The Waneta Expansion Project (WAX) is located near the existing Waneta Dam site at the confluence of the Pend d?Oreille and Columbia rivers, approximately 10 km (6.2 miles) south of Trail, BC, Canada.
Mar 1, 2014
-
Weathering Characteristics of Cemented Paste Backfill: Mineralogy and Solid Phase ChemistryBy Valérie J. Bertrand, Richard W. Lawrence, Marcos G. Monroy
Two cemented paste backfill (CPB) formulations containing pyritic tailings were leached in deionized water in flooded and alternating air-flooded environments and in a simulated acid rock drainage-typ
Jan 1, 2000
-
Roof Bolting Patterns At The Four-Way Entry IntersectionsBy Syd S. Peng
According to accident statistics (l, 2), roof fall accidents occur quite frequently at the intersections of underground? openings and account for up to 30% of the roof fall fatalities. But this figure
Jan 1, 1978
-
Amoco DevelopsThompson Creek Molybdenum MineBy William A. Gibson, Kenneth P. Neumann
In 1967, development of the Cyprus Thompson Creek molybdenum deposit began near Challis, ID. The first mining claims were staked on an intrusive rock out-crop. Exploration continued for 14 years. In 1
Jan 1, 1984
-
Rosario Dominicana's Cyanide Tailings Dam Construction and OperationBy Richard Addison
Rosario Dominicana, S. A. operates an 8,500 tonne per dayopen pit gold/silver mine in the Dominican Republic on the Caribbean island of Hispaniola. The mine is located in an agricultural area which is
Jan 1, 1980
-
Coal Division - Refuse Disposal From Goal Operations ? The Art Of Using Vacuum Disc Filters To Close Plant Water Circuits ? IntroductionBy D. M. Carris
Since the Buffalo Creek incident in February, 1972, Federal and state environmental agencies have had the pressure on the coal industry in the Appalachian area to close the coal processing plant water
Jan 1, 1979
-
Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) Surfaces (17dc924a-7033-4a78-a34e-2c2e5dccdcc7)By J. Drelich
An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras
Jan 1, 1999
-
Aggregate Mining: A Process Of Shaping New Landscapes ? IntroductionBy Anthony M. Bauer
It is the nature of mining to reshape the landscape. Mining is an earth moving process with many of the same activities associated with the regrading of a site for a shopping center, drainage channel,
Jan 1, 1984
-
Use of Structure from Motion Photogrammetry for Monitoring of Underground Storage FacilitiesBy Malte J. M. Gurgel, Axel Preusse
The planning, construction, and monitoring of underground storage facilities is a key factor in meeting upcoming challenges as part of the energy transition from fossil fuels to renewables. Therefore,
Jul 1, 2023
-
Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel
With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co
Dec 1, 2022
-
Jackleg Drill Usage and AccidentsBy C. Clark, J. Seymour, D. Benton
"National Institute for Occupational Safety and Health NIOSH is conducting research on jackleg use and related accidents in underground metal mines. This paper provides an analysis and overview of jac
Jan 1, 2016
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Application of arithmetic progression to haul road geometric design - SME Transactions 2012By A. D. Ajak
A complete mining cycle involves digging, loading, hauling and dumping of the materials. Moving the ore from the pit to the crusher or to the waste dump requires access routes, which are termed haul r
Jan 1, 2012
-
Optimization of Drying and Preheating Temperatures During Pellet Induration for Utilizing Goethitic Iron OresBy Rameshwar Sah, Basavaraja Maribasappanavar, Sangamesh Desai, G. Balachandran, Ravi Kant Sagar
The present research work deals with the effective utilization of hematite ore containing goethite, kaolinite and gibbsite losson- ignition (LOI) phases in pellet making without deteriorating product
Jun 4, 2022