Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    The Effect of Charge Mass and Delay Timing on Airblast Overpressure

    By Adrian Moore, Dominic Hooton, Alan Richards

    Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m

    Jan 21, 2025

  • ISEE
    Modified Site Response Blasting: The Role of Rock Mechanics in Perimeter Control

    This paper is written in response to a request from the UTRC Committee on Perimeter Control Blasting. That Committee is conducting "follow-on" research on the selection of appropriate blasting designs

    Jan 1, 1984

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • ISEE
    Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit Mine

    By Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez

    The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain

    Feb 1, 2020

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines

    By Reinhold Daykin, Piers Wendlandt, Nathan Rouse

    Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove

    Feb 1, 2020

  • ISEE
    Swedish Cautious Blast Excavation at the CSM/ONWI Test Site in Colorado

    By Roger Holmberg, William Hustrulid

    Swedish cautious blasting techniques were used to excavate a room at the CSM Experimental Mine in Idaho Springs, Colorado,as part of a ONWI/DOE sponsored nuclear waste disposal research program.

    Jan 1, 1981

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • ISEE
    EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries

    By Matthew Clay, Colin Chambers, Susan Hookham

    Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed

    Jan 1, 2017

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010

  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Blast Vibration Damage Potential in a Residential Structure from Intentional Full-Scale Nearfield Quarry Blasting

    By Josh Calnan, Zach Agioutantis, Daykin Schnell

    Damage complaints are a common occurrence related to blasting activities, specifically when blasting operations occur near residential areas. These complaints are often associated with ground vibratio

    Jan 26, 2026

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020