Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blast Optimisation at an Australian Gold MineBy Stuart Pether, Cedric Goode
The Mt Morgans Minesite is located 800km North East of Perth, the Capital City of Western Australia. The surrounding region has been a significant producer of gold since the turn of the century. The m
Jan 1, 1996
-
Austin's New Delay Primper RelayBy Roger N. Prescott
This report presents a new process in delay blasting with the use of ANFO and slurry explosives.
Jan 1, 1977
-
A New Approach to Predict and Reduce Blast Vibrations by Modelling of Seismograms and Using a New Electronic Initiation SystemBy R Ludeling, Klaus G. Hinzen, Ulrich Steiner, Friedrich Heinemeyer, Peter Roh
A method for hybrid modelling of blast vibrations in time domain is developed. Field seismograms of single shot experiments are combined with computer simulations. In this way firing times of blasthol
Jan 1, 1987
-
The Application of GPS Positioning and Drill Monitoring TechnologyBy Carl Hendricks
AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of
Jan 1, 2002
-
Achieving Ore-Waste Separation By Dual-Fragmentation BlastingBy Robert M. Carland, Horace Gene Biggs, David Holland
At a North Carolina feldspar surface mine, the orebody contains intrusions of waste material occurring at various angles from horizontal to dipping, and varying considerably in thickness. In order to
Jan 1, 1990
-
Priming with Multiple Delays with the Same TimingBy David Lilly
The introduction of electronic caps with significantly more precise timing is forcing an examination into the practical effects of timing precision upon vibration, air blast, fragmentation and crusher
Jan 1, 2006
-
Research on Program Design for Control Blasting of Reinforced Concrete Frame StructuresBy Wang Hao
"Demolition of reinforced concrete frame structures in building crowded cities is a hardproblem in control blasting. Any mistakes, e.g. wrong toppling direction of multi-storeybuilding or incompleted
Jan 1, 1993
-
Journal: Blastserve A Discussion Forum for ISEE Members (8c2fadf8-c3ea-4d52-bed4-9f74e7ae96c9)Lightning Strikes on Vehicles Transporting Explosives The police in one of the countries in which we operate has asked about the consequences of a lightning strike on a vehicle (box van) carrying deto
Jan 1, 2011
-
Vibration Criteria for Landmark StructuresBy John R. Schuring, Walter Konon
The 2.0 in./sec. peak particle velocity criterion traditionally used to protect structures from blast induced vibration damage is non-conservative for landmark structures. Various factors which must b
Jan 1, 1984
-
Pre-Split Economics and Practice at Gold Fields Operating Co. - Chimney Creek MineBy Lyle Avey
For the purpose of this paper, testwork and general pre-splitting practice will be discussed for the Chimney Creek Mine.
Jan 1, 1990
-
Ammonium Nitrate Blasting Agents Quality Testing for Maximum BenefitBy Philip H. Porter
Ammonium nitrate blasting agents continue to be the work-horse of the explosives industry. The versatile, low-cost, anfo products, whether packaged, poured, or bulk, continue to produce superior resul
Jan 1, 1984
-
Components of Successful Test Blast ProgramsBy C H. Dowding, P W. Linehan
Many of the technical and non-technical or human problems associated with blasting can be minimized through a proper preconstruction test-blast program.
Jan 1, 1986
-
Rock Blasting Environmental ImpactsBy Carlos Agreda
The rock blasting environmental impacts such as: flyrock, groud vibrations,airblast,and/or noise, dust and fumes are identified and mentioned. Some comments on the correction factors that might be tak
Jan 1, 1995
-
Sequential Timing for Ore Control Blasting in NevadaBy Dale Nies, David P. Childs
The open pit gold and silver mining operations in the State of Nevada have historically used simple row by row, echelon, or chevron delay patterns. Common practice has been to use detonating cord trun
Jan 1, 1991
-
A Multiple Deck Burn Round for Shaft SinkingBy Thomas L. Barkley
This paper describes an unusual design for a 12 foot diameter, 30 foot deep circular shaft shot in a close in urban environment less than 100 feet from occupied structures. It uses diagrams, video foo
Jan 1, 1994
-
Computer Aided Design of Ring BlastsBy Calvin Konya, Theodore R. Myers, Robert Lundquist
The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig
Jan 1, 1990
-
Conditions for Sympathetic Initiation of Explosives in Small DiametersBy B Mohanty, R Deshaies
Initiation of small diameter explosives by sympathetic shock pressure in water has been investigated under controlled laboratory conditions. Changes either in the geometry of the donor explosive or it
Jan 1, 1992
-
Importance of Straight Hole DrillingBy Stephen Hamilton
This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst
Jan 1, 1999
-
The Application and Economics Benefits of Blasthole Drill MonitorsBy John F. Vynne
This paper will discuss the application of available monitoring technology on blasthole drills with the goal being to reduce costs and increase productivity. Case studies from the monitoring of blasth
Jan 1, 1997
-
Close-In Blasting at CornellBy Jeff Yaro, Steven P. Case, Carl Kish
This project involved the construction of a new 4-story library on the campus of Cornell University in Ithaca, New York. The new building was constructed completely below grade, adjoining several of t
Jan 1, 1992