Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast Optimisation at an Australian Gold Mine

    By Stuart Pether, Cedric Goode

    The Mt Morgans Minesite is located 800km North East of Perth, the Capital City of Western Australia. The surrounding region has been a significant producer of gold since the turn of the century. The m

    Jan 1, 1996

  • ISEE
    Austin's New Delay Primper Relay

    By Roger N. Prescott

    This report presents a new process in delay blasting with the use of ANFO and slurry explosives.

    Jan 1, 1977

  • ISEE
    A New Approach to Predict and Reduce Blast Vibrations by Modelling of Seismograms and Using a New Electronic Initiation System

    By R Ludeling, Klaus G. Hinzen, Ulrich Steiner, Friedrich Heinemeyer, Peter Roh

    A method for hybrid modelling of blast vibrations in time domain is developed. Field seismograms of single shot experiments are combined with computer simulations. In this way firing times of blasthol

    Jan 1, 1987

  • ISEE
    The Application of GPS Positioning and Drill Monitoring Technology

    By Carl Hendricks

    AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of

    Jan 1, 2002

  • ISEE
    Achieving Ore-Waste Separation By Dual-Fragmentation Blasting

    By Robert M. Carland, Horace Gene Biggs, David Holland

    At a North Carolina feldspar surface mine, the orebody contains intrusions of waste material occurring at various angles from horizontal to dipping, and varying considerably in thickness. In order to

    Jan 1, 1990

  • ISEE
    Priming with Multiple Delays with the Same Timing

    By David Lilly

    The introduction of electronic caps with significantly more precise timing is forcing an examination into the practical effects of timing precision upon vibration, air blast, fragmentation and crusher

    Jan 1, 2006

  • ISEE
    Research on Program Design for Control Blasting of Reinforced Concrete Frame Structures

    By Wang Hao

    "Demolition of reinforced concrete frame structures in building crowded cities is a hardproblem in control blasting. Any mistakes, e.g. wrong toppling direction of multi-storeybuilding or incompleted

    Jan 1, 1993

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members (8c2fadf8-c3ea-4d52-bed4-9f74e7ae96c9)

    Lightning Strikes on Vehicles Transporting Explosives The police in one of the countries in which we operate has asked about the consequences of a lightning strike on a vehicle (box van) carrying deto

    Jan 1, 2011

  • ISEE
    Vibration Criteria for Landmark Structures

    By John R. Schuring, Walter Konon

    The 2.0 in./sec. peak particle velocity criterion traditionally used to protect structures from blast induced vibration damage is non-conservative for landmark structures. Various factors which must b

    Jan 1, 1984

  • ISEE
    Pre-Split Economics and Practice at Gold Fields Operating Co. - Chimney Creek Mine

    By Lyle Avey

    For the purpose of this paper, testwork and general pre-splitting practice will be discussed for the Chimney Creek Mine.

    Jan 1, 1990

  • ISEE
    Ammonium Nitrate Blasting Agents Quality Testing for Maximum Benefit

    By Philip H. Porter

    Ammonium nitrate blasting agents continue to be the work-horse of the explosives industry. The versatile, low-cost, anfo products, whether packaged, poured, or bulk, continue to produce superior resul

    Jan 1, 1984

  • ISEE
    Components of Successful Test Blast Programs

    By C H. Dowding, P W. Linehan

    Many of the technical and non-technical or human problems associated with blasting can be minimized through a proper preconstruction test-blast program.

    Jan 1, 1986

  • ISEE
    Rock Blasting Environmental Impacts

    By Carlos Agreda

    The rock blasting environmental impacts such as: flyrock, groud vibrations,airblast,and/or noise, dust and fumes are identified and mentioned. Some comments on the correction factors that might be tak

    Jan 1, 1995

  • ISEE
    Sequential Timing for Ore Control Blasting in Nevada

    By Dale Nies, David P. Childs

    The open pit gold and silver mining operations in the State of Nevada have historically used simple row by row, echelon, or chevron delay patterns. Common practice has been to use detonating cord trun

    Jan 1, 1991

  • ISEE
    A Multiple Deck Burn Round for Shaft Sinking

    By Thomas L. Barkley

    This paper describes an unusual design for a 12 foot diameter, 30 foot deep circular shaft shot in a close in urban environment less than 100 feet from occupied structures. It uses diagrams, video foo

    Jan 1, 1994

  • ISEE
    Computer Aided Design of Ring Blasts

    By Calvin Konya, Theodore R. Myers, Robert Lundquist

    The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig

    Jan 1, 1990

  • ISEE
    Conditions for Sympathetic Initiation of Explosives in Small Diameters

    By B Mohanty, R Deshaies

    Initiation of small diameter explosives by sympathetic shock pressure in water has been investigated under controlled laboratory conditions. Changes either in the geometry of the donor explosive or it

    Jan 1, 1992

  • ISEE
    Importance of Straight Hole Drilling

    By Stephen Hamilton

    This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst

    Jan 1, 1999

  • ISEE
    The Application and Economics Benefits of Blasthole Drill Monitors

    By John F. Vynne

    This paper will discuss the application of available monitoring technology on blasthole drills with the goal being to reduce costs and increase productivity. Case studies from the monitoring of blasth

    Jan 1, 1997

  • ISEE
    Close-In Blasting at Cornell

    By Jeff Yaro, Steven P. Case, Carl Kish

    This project involved the construction of a new 4-story library on the campus of Cornell University in Ithaca, New York. The new building was constructed completely below grade, adjoining several of t

    Jan 1, 1992