Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Framework for Estimating Cost of Infrastructure Adaptation to Climate Change

    By H. Lee

    Recently, the effects of global climate changes have become top concerns for governments? decision making regarding infrastructure investments. Extreme weather events that exceed the capacity of exist

    Aug 1, 2013

  • CIM
    Review on Separation and Treatment of Thorium Resources

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Thorium is frequently the main radioactive element in rare earth ores and is a resource that can potentially substitute for uranium. Thorium must be separated from rare earths in order to obtain produ

    Jan 1, 2014

  • CIM
    Optimizing Stope Sequence in a Diminishing Ore Pillar: A Case Study

    By Shahé Shnorhokian

    Numerical modeling is increasingly being used as a tool to examine complex geomechanical issues related to rockmass behaviour and stability of underground openings. The in-situ stress regime and the e

    Aug 1, 2013

  • CIM
    A guideline for tendon support design

    By Brian O'Hearn, Doug Hanson

    "The most commonly used tendon supports in the Sudbury area include rock bolts, rebars, friction anchors and cable bolts. Due to the fact that these tendons are physically different and employ differe

    Jan 1, 1995

  • CIM
    Prevention and Control of Rockbursts in Dongguashan Copper Mine

    By L. Tang

    A seismic monitoring system was installed in 2005 at Dongguashan Copper Mine, the deepest metal mine in China. Based on the seismic events monitored in situ, the possibility of rockburst prediction an

    May 1, 2009

  • CIM
    Diamond Processing a Review and Comparison of Technology Worldwide

    By Mark Stephenson, Paul Henharen

    "The objective in the mineral processing of primary ores is to liberate and effectively recover each individual economically viable diamond with minimal reduction in its potential value.There are thre

    Jan 1, 1994

  • CIM
    Geology as a Risk Factor in Project Evaluation: Its Impact on Reserve Estimation (2ef6f64b-2707-4726-a421-479467e1e910)

    By Chris M. Healey

    "Perhaps the single most significant variable in the evaluation of a mining project is the reserve estimate. Many parameters are considered when estimating reserves, among them geology. This paper exa

    Jan 1, 1992

  • CIM
    SAG and Ball Mill Circuit Layout and Design (f5d48ee8-8f45-4465-ae05-c13a7b07d4ee)

    By S. Perkins, E. Young, L. Dufour, K. McVey, L. Rolandi

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Grain Refinement of TiAl Castings by Isomorphic Self Inoculation

    By J. Zollinger, J. R. Kennedy, E. Bouzy, B. Rouat, D. Daloz

    "Ni-based superalloys have been replaced in the last low pressure stage of jet turbines for aircraft by titanium aluminides. In order to improve the properties of these Ti-Al alloys and extend their u

    Jan 1, 2016

  • CIM
    Are We Choosing the Best-Suited Carbon for our CIP Circuits?

    By Ron Hatch, M. K. Witte

    "INTRODUCTIONThe proper selection of carbon for a gold carbon in pulp (CIP) circuit involves careful evaluation of several physical, chemical and economic factors. A series of evaluations are required

    Jan 1, 1985

  • CIM
    Factors affecting the leaching of radium-226 from barium-radium sulphate sludges

    By P. M. Huck, R. John

    "The National Uranium Tailings Program was established in 1982 to develop, in part, a mathematical predictive model which would allow the assessment of the impact of uranium mill tailings on the envir

    Jan 1, 1989

  • CIM
    Commercial Application of Biotechnology to Enhance Gold Extraction from Complex Sulphides

    By P. B. Marchant

    "Based on laboratory and pilot scale continuous biooxidation of complex sulphide concentrates, commercial processing design and scaleup considerations are discussed. Capital and operating cost estimat

    Jan 1, 1986

  • CIM
    Managing the replacement and the stocking of equipment engines

    By J. L. Collins

    "This paper deals with the quantitative analysis of mine maintenance records. Based on a case study of dozer engine records, the author suggests an easy method of deriving useful information for manag

    Jan 1, 1987

  • CIM
    The beneficiation of Canadian garnet ores at CANMET

    By P. R. A. Andrews

    "Garnet occurs in schists and gneisses in all provinces of Canada, all mainly in Quebec and Ontario. There is currently a renewed interest in exploration for economic sources of garnet for abrasive ap

    Jan 1, 1995

  • CIM
    The Factors Impacting Time and Cost of Flowsheet Development

    By M. Hawker, M. Kreuh

    The mining and metallurgy industry is known to be of cyclical nature associated with price volatility. As such, some years are quite lucrative and other years require mining companies to tighten their

    Jan 1, 2014

  • CIM
    20 Years of Don Process and its new Benefits for Cu-Ni-Pgm Bulk Concentrates

    By Paivi Suikkanen, Kari Hietala, Kaarlo Haavanlammi

    "Processing of high-magnesia concentrates, the recoveries of nickel and copper, as well as those of platinum group metals (PGM’s) and cobalt are key issues of the Nickel Smelting technologies. PGMs ar

    Jan 1, 2014

  • CIM
    Info to Decisions - Application of Decision Networks in Mine Management Systems

    By Steven Chung

    Decision Network Modelling in a mining operation represents a complex process environment that is inherently more variable than a processing plant or factory. The uncertain availability of loading loc

    May 1, 2010

  • CIM
    Use of Rubber Liners in the Ball Mills at Brenda Mines Limited

    By R. G. Bradburn

    "Brenda Mines Limited is a low grade open pit mining and milling operation located near Peachland, British Columbia. The mill was brought into production in late 1969 at a rated capacity of 24,000 ton

    Jan 1, 1981

  • CIM
    Transforming Modern Mining

    By Paul Johnston

    or is it? Mining Automated Loader Technology Application ? Intelligent software mounted in hardware on a remotely controlled scoop. ? Led by INCO, Sudbury, with ? C-CORE, St. John?s ? Automated

    May 1, 2008

  • CIM
    Land use issues in mineral extraction

    By K. Sinding, R. Poulin

    "Recent land-use decisions in British Colwnbia, and the publication of a report on compensation for expropriations of resource interests, have highlighted the nature of land use policies. Landuse deci

    Jan 1, 1994