The Factors Impacting Time and Cost of Flowsheet Development

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 9
- File Size:
- 611 KB
- Publication Date:
- Jan 1, 2014
Abstract
The mining and metallurgy industry is known to be of cyclical nature associated with price volatility. As such, some years are quite lucrative and other years require mining companies to tighten their belts. The field is a mix of junior, mid-tier, and major mining companies. One thing that is common to all of them is the time required and the cost to develop a flowsheet in accordance with best practices. Although a long list of factors can impact flowsheet development, this paper will include the impacts of: experienced metallurgical engineers and laboratories, representative samples for high quality and valuable testwork results, and following engineering development stages. The paper also provides typical time frames to complete selected engineering flowsheet development steps.
Citation
APA:
(2014) The Factors Impacting Time and Cost of Flowsheet DevelopmentMLA: The Factors Impacting Time and Cost of Flowsheet Development. Canadian Institute of Mining, Metallurgy and Petroleum, 2014.