Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Heat Management in Mining Industry: Personal Risk Factors, Mitigation Practices, and Industry Actions

    By E. Talebi, P. Roghanchi

    "This study aims to discuss personal and behavioral parameters contributing to heat-related accidents. To study the prevention approaches, it is essential to look at the various factors at the individ

    Jan 1, 2019

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Effect of Copper and Magnesium Contents and Quenching Rate on Age Hardening Behavior of 2000 Series Aluminum Alloys

    By H. Yoshida, H. Hatta, T. Suzuki

    "The effect of the copper and magnesium contents and quenching rate during quenching on the age hardening behavior of 2000 series aluminum alloys was investigated. For the higher copper-containing spe

    Jan 1, 2018

  • CIM
    Wireline Hydraulic Mini-frac Testing: Experiences in the ANDRILL SMS Borehole, McMurdo Sound, Antarctica

    By Douglas R. Schmitt

    In general, knowledge of the state of stress within the Antarctic lithosphere remains largely unconstrained due in part to Antarctica?s inaccessibility and because of the paucity of seismic focal mech

    Jun 1, 2012

  • CIM
    Risk Management for the Mining Industry using Quantitative Risk Assessments

    By Iain G. Bruce

    The need to improve supply reliability while improving our environmental record during the past half decade of low metal prices has required the mining industry to prioritise expenditures. Quantitativ

    May 1, 2003

  • CIM
    Analysis on Roadway Roof Bed Separation Affected to Bolt Loading and Support Design in Engineering

    By Shuan-cheng Gu

    Roof bed separation often occurred due to the deformation incoordination of surrounding rock following the excavation of mine roadway. Bed separation has effect on the bolts, and the estimation of the

    Aug 1, 2013

  • CIM
    Increasing Anode Thickness to Optimise Copper Production at the Kidd Metallurgical Site

    By M. R. Coffin

    In recent years, improved operation of the Kidd smelter has resulted in an increase in blister production capacity. Due to manpower and equipment limitations anode production and treatment rates could

    Jan 1, 2007

  • CIM
    A Local Additional Potential Model For Pipeline Stress Corrosion Cracking

    By Z. Y. Liu

    A local additional potential model (LAPM) was developed to illustrate the role of strain rate in stress corrosion cracking (SCC) of pipelines. According to LAPM, both density and mobility of the local

    Jan 1, 2010

  • CIM
    Kinetics of High Pressure Leaching of Nickel Lateritic Ores

    By B. Friedrich, N. Anastasijevic, S. Stopic

    The extraction of nickel from Serbian and Western Australian lateritic ore by sulphuric pressure acid leaching (PAL) has been studied. The following parameters were tested: stirring rate, acid to ore

    Jan 1, 2004

  • CIM
    Preliminary Investigation for the Development of a Leaching Technology for Gold Extraction from the Buzwagi Copper Sulphide Ores

    By G. Deschênes

    Located in North West Tanzania, Buzwagi is an underground narrow-vein gold mine owned by Barrick Gold. The plant was commissioned in 2000. The reserves are estimated to be more than 25 years. The ore,

    Jan 1, 2012

  • CIM
    Nanostructured Gold and Alloys for Fuel Cell Catalysis

    By Chuan-Jian Zhong

    Gold-based nanoparticles in the size range of a few nm have attracted increasing interests in catalysis, sensors and biomedical applications. The study of the unique catalytic properties of nanosized

    Oct 1, 2003

  • CIM
    Part 1 ..... Glass, Clay Products and Ceramic-Metal Systems

    "Many advances in glass technology and processing are being made and the possibilities for glass as a material in the future appear unlimited. Float glass, glass-ceramics, high-strength sheet and cont

    Jan 1, 1967

  • CIM
    Creating Sustainability at Antamina

    By Steven D. Botts

    The Antamina project, owned by BHP Billiton Plc, Mitsubishi Corporation, Noranda Inc., and Teck Cominco Ltd. , is a $2.3 billion copper/zinc project, located in the Ancash Department in Perú. The proj

    May 1, 2002

  • CIM
    Shale Failure Mechanics and Intervention Measures in Underground Coal Mines: Results from 50 Years of Ground Control Safety Research Keynote

    "Ground control research in underground coal mines has been ongoing for over 50 years. One of the most problematic issues in underground coal mines is roof failures associated with weak shale. This pa

    Jan 1, 2015

  • CIM
    MacIsaac's Mining and Milling Project at Inco Limited's Shebandowan Mine

    By E. J. Marcotte

    "INCO LIMITED'S Shebandowan Mine and Mill is located in a scenic tourist and cottage area near the western tip of Lower Shebandowan Lake, approximately 90 Km west of Thunder Bay, Ontario. This nicely

    Jan 1, 1992

  • CIM
    Mechanism of Scorodite Formation at Ambient Temperature as Determined by Tem Analysis

    By H. Itou

    A mechanism of scorodite formation at ambient pressure was investigated using transmission electron microscopy (TEM). Several types of iron arsenate were obtained from Fe/As solutions (Fe/As = 1.0 and

    Jan 1, 2006

  • CIM
    Frog's Leg Gold Project - A Non-Traditional Approach to Development

    By J. P. Nicoud

    "The Frog's Leg project is located in the Kundana mining centre 22 kms West of Kalgoorlie, in Western Australia. The Mines and Resources Australia (MRA) Dioro Exploration Joint Venture has had co

    Jan 1, 2005

  • CIM
    Continuous Evolution of Porcupine Joint Venture (PJV) Dome Mine's Effluent Treatment Plant

    By T. Y. Chong, J. A. Folinsbee

    Since milling began in 1909, the PJV Dome mill has been expanded several times, to the current throughput of 11,500 tonnes per day. PJV recovers free gold using crushing and grinding followed by gravi

    Jan 1, 2005

  • CIM
    La modèlsation du broyage des concentrés d'hématite à Sidbec-Normines

    By John Redstone, André R. Laplante

    "Le rebroyage des concentrés d'hématite en usine (Sidbec-Normines, Port-Cartier) et en laboratoire a été modélisé selon le modèle de Reid (1965).L'effet du pourcentage solide sur la cinétiqu

    Jan 1, 1983

  • CIM
    Non-Oxidative Nickel Leach Capacity Review through Isothermal Modelling Of Mineralogical and Chemical Concentration Profiles

    By E. Engelbrecht

    "A pressure non-oxidative leach is employed at Anglo American Platinum Base Metal Refiners to extract nickel from a slow cooled matte. The design base requires two 80 m3 autoclaves in parallel to achi

    Jan 1, 2017