Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Lithological and Geochemical Features of Igneous and Sedimentary Rocks at the Omai Gold Mine, Guyana, South AmericaBy Luc Harnois, Gabriel Voicu, Marc Bardoux, Robert Crépeau
"Abstract-Detailed petrographical and geochemical studies have been carried out on the igneous and sedimentary rocks in the Omai area, part of the Paleoproterozoic Barama-Mazaruni greenstone belt, Guy
Jan 1, 1997
-
Lithological and Geochemical Features of Igneous and Sedimentary Rocks at the Omai Gold Mine, Guyana, South America (7a331fd6-1548-475b-975d-314442f03c89)By Gabriel Voicu, Harnois Luc, Marc Bardoux, Robert Crépeau
"Detailed petrographical and geochemical studies have been carried out on the igneous and sedimentary rocks in the Omai area, part of the Paleoproterozoic Barama-Mazaruni greenstonebelt, Guyana. The s
Jan 1, 1997
-
Starting Koala North — North America’s first underground diamond mine (3411bd0a-cb31-4972-a1b8-9d78990f23d8)By P. Harvey
"Following initial discovery in 1991, BHP Billiton Diamonds Inc. opened Canada’s first diamond mine, the EKATI Diamond Mine (EKATI) in the Northwest Territories on October 14, 1998. Four short years l
Jan 1, 2005
-
Process Mineralogy of Copper and Lead Concentrates: Uncertainties and Metallurgical DecisionsBy Mostafa Benzaazoua, Emilie Ré, Raphaël Mermillod-Blondin, Hassan Bouzahzah, Jean-François Wilhelmy, University of Québec in Abitibi-Témiscamingue
"We analyzed two copper and lead flotation concentrates from the LaRonde mill using MLA technology (Mineral Liberation Analyzer) to identify the contaminants and to quantify their size and liberation.
Jan 1, 2016
-
Silica-Kaolin Deposits of Algocen Mines LimitedBy D. E. Smith, M. K. Murthy
"The commercial potential of a silica-kaolin deposit that occurs on the banks of and close to the Missinaibi River in the District of Cochrane, Ontario, is under evaluation by Algocen Mines Limited. T
Jan 1, 1970
-
Extending the life of INMETCO’s submerged arc furnace liningBy C. Doyle, D. M. Hoffman, C. Díaz, J. Hrepic, W. J. Koshut, R. H. Hanewald
"Recently, lining life of the INMETCO submerged arc furnace has been dramatically extended from an average of eleven months in the 1980s to a current record of 34 months. This paper summarizes test wo
Jan 1, 1997
-
Development and Calibration of a Reconciliated Mineralogy Method Based on Multitechnique Analyses: Application to Acid Mine Drainage PredictionBy H. Bouzahzah
The field of quantitative mineralogy has evolved significantly through the development of image analysis techniques and information technology. Quantitative mineralogical characterization can now be r
Jan 1, 2016
-
The Canada Tungsten Property, Flat River Area, Northwest TerritoriesBy L G. White
During 1958, prospecting parties working for the Mackenzie Syndicate in the Flat River area of the Mackenzie mountains, Northwest Territories, identified tungsten mineralization and located the proper
Jan 1, 1963
-
Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, QuebecBy Louis Cabot
A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript
May 1, 2001
-
A Human Body Posture Sensor for Monitoring and Diagnosing MSD Risk FactorsBy A. Alwasel
Musculoskeletal disorders (MSDs) threaten the wellbeing and livelihood of a large number of construction workers incurring a significant cost to society. We present a new method to monitor and diagnos
Aug 1, 2013
-
Geological, geophysical and geochemical considerations for exploration in clay-covered areas: a reviewBy B. W. Smee
Glacial lake sediments or glaciolacustrine deposits form a significant portion of the Canadian, Scandinavian and Russian landscapes. Furthermore, 50 per cent of the Archean volcanic belts within the C
Jan 1, 1979
-
A Study of the Reaction Mechanisms for the Iron Segregation ProcessBy T. H. Etsell, P. Kerr, Qi Liu
"The objective of this investigation was to study the reaction mechanisms during the reduction of iron oxides in the presence of calcium chloride and carbon black as a simplified iron segregation proc
Jan 1, 2016
-
Estimating the Energy Recovery Potential of Newmont’s Carlin Mine Dry Grinding CircuitBy Aidan Giblett, Michael McGlynn, Peter Radziszewski
"On the basis that 99% of the energy input into a mill is converted into heat, it is possible to estimate the amount of energy captured in the slurry, the amount that is lost to the environment as wel
Jan 1, 2016
-
The Business Case: Defining the ProjectBy Rob Boom, Yasuyuki Tozaki, Greg Traquair
The objectives of the business case are to examine a proposed metallurgical project and answer fundamental questions about project feasibility, risks, opportunities, and value. A business case fulfill
Jan 1, 2015
-
Uranium in Early Proterozoic Aillik Group, LabradorBy Sunil S. Gandhi
"Uranium occurrences are widely distributed in tuffaceous-argillaceous beds and abundant rhyolitic volcanic rocks of the upper Aillik group, which is more than 3 km thick and over 125 km by 40 km in a
Jan 1, 1986
-
The Flsmidth® Rapid Oxidative Leach (Rol) Process. Part Ii: A New Chemical Activation Process for ChalcopyriteBy F. Baczek, S. S. Rocks, D. Chaiko, C. Eyzaguirre, S. Asihene, T. Walters
The majority of efforts to improve primary copper sulfide leaching have focused on solution chemistry, temperature, O2 pressure, ultra-fine grinding, the use of catalysts, etc. Historically, very few
Jan 1, 2015
-
Comparison of Mine Ventilation Software Tools for Underground Coal Mines in Harsh ConditionsBy T. Imgrund, A. Bischoff, S. Spürk
"Specific conditions of underground coal mines at great depth, such as high temperatures, high rates of methane inflow and natural ventilation pressure provide considerable challenges for the reliable
Jan 1, 2019
-
Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce CostsMining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins
May 1, 2013
-
Redesign of Furnace No. 1 at the Pobuzhsky Ferronickel CombineBy N. Novikov, M. Jastrzebski, N. Kryzhanovskaya, D. Shevchenko, I. Kapran, N. V. Novikov, T. Koehler, B. Zaporozhets
"The PFK FeNi Smelter was re-commissioned by Solway Resources in 2002, ending a long period of economic decline in the adjacent town. In 2009 Hatch was retained to design, supply and install a custom
Jan 1, 2012
-
The Social Acceptability Process of the Canadian Malartic MineBy Philippe Angers
This article analyzes the social acceptability process of a mining project located in an existing city. It will explore how the principles of sustainable development have been integrated in the projec
Aug 1, 2013