Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Information Technology Infrastructure - A Sound Basis for Efficient Future Mining Operations

    By M Schmid

    German hard coal mining operations have decreased for more than 40 years. Current political decisions are leading to a discontinuation of subsidised black coal mining by the year 2018. This decision w

    Jan 1, 2008

  • AUSIMM
    Single pass drill, install and inject self-drilling resin bolt application in poor ground

    By T Roberts, D Faulkner, G Watt

    Traditional mechanised resin rock bolting in hard rock underground mines requires the installation of resin capsules into a pre-drilled hole prior to the rock bolt being spun into a hole to mix the re

    Nov 30, 2018

  • AUSIMM
    The Use of Blending Equipment in the Mineral Industry

    After the minim operation, most raw materials that occur in the earth's crust require some form of processing or refining before they can be converted into a final end product. In the mineral

    Jan 1, 1969

  • AUSIMM
    Characterisation of SFCA phases in iron ore sinter by combined optical microscopy and electron probe microanalysis (EPMA)

    By M I. Pownceby, S Hapugoda, H Han, E Donskoi, L Lu

    Iron ore sinter mineralogy and its associated macro-/micro – structure has a strong impact on sinter quality. At a macroscopic scale, sinter ideally consists of a strong, porous matrix which bonds rel

    Nov 8, 2021

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999

  • AUSIMM
    Monitoring as an input to support and sequence design

    By C Hall, K Williams, B Keogh, S Wong

    Cannington mine is a silver lead zinc operation located in north west Queensland. The operation has been in production since 1997. Ore is primarily moved through an underground material handling syste

    Nov 30, 2018

  • AUSIMM
    The Collie River Diversion and Salinity Recovery Project ù A Case Study in Competing Values in a Competing Environment

    By T Sparks

    The Collie River catchment, located approximately 200 km south of Perth, covers an area of around 2830 km2 and is the source of run-off to the Wellington Dam, an important irrigation water resource fo

    Jan 1, 2006

  • AUSIMM
    Evaluation of Management Options for Acid Generating Tailings Deposited on an Arid Peruvian Coast

    By M Rankin, F Medina, R Verburg

    We conducted a preliminary assessment of an extensive deposit of historic tailings discharged over a period of 40 years to the shoreline along a Southern Peruvian coastline. The tailings formed an ext

    Jan 1, 2003

  • AUSIMM
    Geotechnical and Environmental Aspects of Heap Leach Design, Operation and Closure

    By Bronson B

    The geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di

    Jan 1, 1994

  • AUSIMM
    Emerging Technology for Economic and Ecological Sustainability in the Rehabilitation of Metal Mine Tailings

    By L Huang

    "Successful rehabilitation of tailings landforms of tens to thousands of hectares in size at base metal mines is critical to mining companies’ ‘social licence to operate’. Rehabilitation technology us

    Jun 28, 2016

  • AUSIMM
    Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia

    By Saghafi A, Kelly M, Williams R. J

    A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving

    Jan 1, 1988

  • AUSIMM
    Keynote Environmental Address

    The geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di

    Jan 1, 1994

  • AUSIMM
    Evaluation of a UAV-LiDAR system for mapping geological structures in an open pit highwall

    By B Banerjee, H Masoumi, X Shen, S Raval, D Tannant

    Structural mapping of pit walls can be performed using digital images and photogrammetry software, but the performance is limited by weather and environmental conditions including dust, rain and light

    Nov 30, 2018

  • AUSIMM
    The Continuing Evolution of Gas Drainage in Australia

    By E Yurakov, D J. Ashelford, M I. Slate

    The push for increasing coal production rates continues to place increasing demands on mine management to safely and effectively control seam gas. Gas drainage strategies applied vary in both effectiv

    Jan 1, 2005

  • AUSIMM
    The Development of Models in Minerals Processing

    By I Cameron

    Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of

    Jan 1, 1998

  • AUSIMM
    Biomineralisation ù A Novel Approach for Immobilising Toxic Metals in the Environment

    By L C. Thompson

    Biomineralisation is the process by which microorganisms mediate and catalyse inorganic reactions so as to form new mineral assemblages. The goal of biomineralisation as a remediation tool is to contr

    Jan 1, 2004

  • AUSIMM
    Dispute Review Boards - A Better Way To Go?

    The arbitration process, and its drawbacks: Any time you have taken part in a major arbitration, and the decision, when it comes out, is not what you thought it would be (which is bound to happen occa

    Jan 1, 1999

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron Deposit

    BHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t

    Jan 1, 2005