Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Performance of Shallow Water Covers on Pyritic Uranium Tailings

    By N K. DavT, A Coggan

    The performance of in situ, shallow water covers in controlling acid generation was evaluated at four recently decommissioned pyritic uranium tailings sites at Elliot Lake, Ontario, Canada. The tailin

    Jan 1, 2003

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Enough is Enough ù Environmental Fallacies Confronted by the Mining Industry

    For too long we, as an industry, have borne the brunt of irrational claims, poor science and even worse, journalism with regards to our affect on the environment. To some of us, the overwhelming media

    Jan 1, 2004

  • AUSIMM
    Getting the Burden Right

    By J Poniewierski, Varcos D

    Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap

    Jan 1, 1994

  • AUSIMM
    An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and Modelling

    By J Janus, J Krawczyk

    Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga

    Jul 1, 2013

  • AUSIMM
    Characterising the In Situ Conditions Within Rehabilitated Spoils at South African Opencast Collieries

    By F D. I Hodgson

    Twenty-seven observation test pits were excavated at four different spoils dumps at three collieries in the Witbank Coalfield. The holes were dug into the upper three metres of the spoils to ascertain

    Jan 1, 2003

  • AUSIMM
    Shifting post-mining land use planning from mine site to regional scale

    By C M. Côte, S Worden, K Svobodova

    Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use

    Aug 2, 2023

  • AUSIMM
    CSIRO Augmented Reality Remote Guiding Platform for the Mining Industry

    By L Alem

    In the field of mineral extraction, complex technologies are being introduced in mines, operators/technicians rely on assistance from an expert (or more) in order to keep their machines functioning. P

    Nov 22, 2011

  • AUSIMM
    Red Dome Mine Closure - Addressing Mine Site Contamination Issues for Lease Relinquishment

    By S Logan, J Pu, J Milsom, G McDonald

    Management of environmental issues is an integral part of the mine decommissioning process. In Queensland, miners must comply with environmental aspects of the Mineral Resources Act and Contaminated L

    Jan 1, 1998

  • AUSIMM
    The Identification of Contaminants in Mine Site Waste Waters by ICP-MS

    By Mine F. J, Woods P. H

    Waste waters from mine sites may be screened for all constituents of significance as a first step in establishing water quality criteria for protection of aquatic ecosystems. Inductively-coupled pla

    Jan 1, 1994

  • AUSIMM
    Site Investigation, Instrumentation and Results of a Trial Embankment on Coal Tailings

    By Morris P. H

    A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou

    Jan 1, 1990

  • AUSIMM
    A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated Landform

    By G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor

    An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D

    Jul 16, 2014

  • AUSIMM
    ICP Analysis In Geochemical Prospecting-1

    In the late 1970's Western Mining Corporation, Exploration Division considered the purchase of a major multi-element spectrometer as an adjunct to our existing atomic absorption spectrophotom

    Jan 1, 1987

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Iron Ore Quantitative Characterisation Through Reflected Light-Scanning Electron Co-Site Microscopy

    By S Paciornik

    The traditional trading of iron ores is based on chemical specifications and particle size distribution. However, recent characterisation studies, that bring additional information like mineralogical

    Jan 1, 2008

  • AUSIMM
    Geochemical Characteristics of River Deposited Mine Wastes and Associated Contact Waters Downstream of the Ok Tedi Mine, Papua New Guinea ù Implications for ARD Management

    By H Kundapen, B R. Bolton, H Davies

    The Ok Tedi porphyry copper-gold mine is located in the Star Mountains of Western Province, Papua New Guinea. Open-cut mine commenced in 1984 and is due to cease around 2010. The mine produces a total

    Jan 1, 2003

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • AUSIMM
    A Century of Resource Use : Is There Sufficient for the Future?

    During the century past geologists have discovered an extraordinary range of mineral resources. It is somewhat surprising, in view of their success, to look back and find that geologists have been con

    Jan 1, 1990

  • AUSIMM
    Planning Stable Post-Mining Landforms: The Application of Erosion Modelling

    By Riley S. J

    The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f

    Jan 1, 1994

  • AUSIMM
    Chain Pillar Design ù Can We?

    By H Jalalifar, N Aziz

    In the ten years since the University of NSW proposed a pillar design methodology for bord and pillar operations, the Australian coal mining industry has changed substantially. What was primarily a bo

    Jan 1, 2005