Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    New perspectives in iron ore flotation – from fundamental studies to on-site pilot testing

    By L O. Filippov, A Piçarra, I V. Filippova, N P. Lima, K Silva

    The reverse cationic flotation using the starch as depressor of iron oxides is the most efficient upgrading process when is applied to the simple systems composed by hematite/magnetite and quartz. The

    Aug 24, 2022

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    University research on molten slags, matte, speiss and metal systems for high temperature processing – challenges, opportunities and solutions

    By E Jak, P Hayes, J Chen, M Shevchenko, E Nekhoroshev, D Shishin

    Recent decades have seen significant advancements in analytical and experimental techniques, thermodynamic theory, and computational capabilities in high temperature research which are particularly ti

    Jun 19, 2024

  • AUSIMM
    Understanding Rock Mass Behaviour through the Development of an Integrated Sensing Platform

    By E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez

    This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl

    May 9, 2016

  • AUSIMM
    Impartiality and Fairness in Stakeholder Engagement Through Triangular Value Analysis

    By J L. Stacey

    The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati

    Jan 1, 2009

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming Conditions

    By Y Li, Z Fu, D J. Williams, E Topal

    Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface

    Jul 27, 2015

  • AUSIMM
    Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WA

    By G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien

    In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por

    Sep 18, 2023

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North Queensland

    By A Parbhakar-Fox, B G. Lottermoser, N Fox

    "Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin

    Jun 15, 2016

  • AUSIMM
    Influence of Shot Design Parameters on Fragmetation

    By Smith N. S, Rholl S. A, Otterness R. E

    The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra

    Jan 1, 1990

  • AUSIMM
    Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives (e3355e4c-7484-44c3-ab2f-95b2e231f322)

    Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. The Zapopan development at Mt Todd in

    Jan 1, 1995

  • AUSIMM
    Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventory

    By J Penman, N Turner, H Liu

    This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s

    Jul 1, 2021

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Effective Life-of-mine Planning by Understanding and Managing Risks and Opportunities Associated with Geological Uncertainty

    By M Berry

    Consider these four questions:What is the definition of life-of-mine?When should life-of-mine planning seriously commence?When can life-of-mine planning seriously commence?What is the key input to eff

    Jul 16, 2014