Search Documents

Sort by

  • NIOSH
    RI 3483 Progress Reports - Metallurgical Division - 35. Electrometallurgical Investigations - Recovery Of Nickel, Copper, And Precious Metals From Domestic Ores By A Combined Electrothermal And Electrolytic Method

    By J. Koster

    [In 1178 thn S-00n of thr !~Viluralcal Divicion, pur--'11 cf Mines, bcran an o. 't iv in': n-t!Y_Vnn of vothod; for recoverin'-1, Achol, copp~r, nK precioun notnin Zycn o;. -z of t

    Jan 1, 1939

  • NIOSH
    RI 7784 Preparation Of Samarium-Cobalt Permanent Magnets

    By J. W. Walkiewicz

    Studies were conducted by the Bureau of Mines to develop a method for fabricating Sm-Co permanent magnets. This method consisted of arc-melting, crushing and grinding the alloy, alining and pressing t

    Jan 1, 1973

  • TMS
    Valorization Of Electrical Arc Furnace Oxidizing Slag

    By Ki Joo Sim, Sung Beom An, Joonho Lee, Minsoo Shin

    Valorization of the electrical arc furnace oxidizing slag by coke was carried out by the reduction of iron oxide in the slag. Since the reduction of iron oxide by solid carbon is an endothermic reacti

    Jan 1, 2014

  • TMS
    Production Of Tungsten By Pulse Current Reduction Of Cawo4

    By Metehan Erdogan, Furkan Özdemir, Ishak Karakaya, Mustafa Elmadaglı

    Tungsten is mainly produced by H2 reduction of WO3 which makes its production difficult and costly. A promising method was recently reported for direct electrochemical production of tungsten from CaWO

    Jan 1, 2016

  • SME
    Use Of A Continuous Belt Filter In A Wet Process Cement Plant

    By E. B. Thorn

    The production of portland cement requires that four basic elements -- calcium, silica, alumina and iron -- be ground to a fine powder, homogenized, and fed to the pyroprocessing unit, where it is bur

    Jan 1, 1984

  • AUSIMM
    North Mine - A Case Study

    By Terlich R. E, Finlayson J. M

    A combination of high virgin rock temperatures, deep workings and extensive utilisation of heavy diesel equipment has presented North Mine (A Division of North Broken Hill Limited) with challenging

    Jan 1, 1988

  • SAIMM
    Furnace Dust From Exxaro Sands KZN

    By D. Bessinger, N. Rughubir

    Exxaro Sands KZN produces?among other heavy mineral products?high titania slag, which is used as feedstock to the pigment industry. The titania slag is produced from the smelting of ilmenite in two 36

    Jan 1, 2007

  • RMCMI
    Membership List (8fc27263-fb04-4c89-b588-acc5fdffba33)

    [Abbott, Jay Union Supply Co., 5460 Colo. Blvd., Denver, Colo. 80022 Achziger, Ronald H Midwest Rubber Co., 6404 E. 39th Ave., Denver, Colo. 80207 Adams, Bob Energy Fuels Corp., Box G, Steamboat S

    Jan 1, 1975

  • TMS
    Thermogravimetric Analysis and Kinetic Study of the Calcification Roasting of Vanadium Slag

    By Qingyun Huang, Wei Lv, Junyi Xiang, Xuewei Lv, Chenguang Bai

    The roasting is the key step for the extraction of vanadium from vanadium slag by calcification roasting–acid leaching process. In this study, thermogravimetric analysis and kinetic study of vanadium

    Mar 1, 2018

  • SME
    Dissolution Behavior Of Cobalt In Iodine/Iodide Solutions

    By K. N. Han

    The dissolution kinetics of cobalt in iodine/ iodide solutions were investigated using a rotating-disc technique. Variables studied included temperature, rotating speed, concentration of lixiviants an

    Jan 1, 1995

  • SME
    The Los Pelambres Overland Conveyor

    By Christof Brewka

    Los Pelambres, 200 km north of Santiago, Chile, is the latest in a series of mega-projects developed in this part of the world. While most of its predecessors are spread over open desert, the Los Pela

    Jan 1, 2000

  • AIME
    Local Section News (d2b04a09-870c-49b6-83e1-a275dcc1d9ae)

    CHICAGO SECTION CHARLES H. MACDOWELL, Chairman, LUTHER V. RICE, Vice-chairman, HENRY W. NICHOLS, Secretary-Treasurer, Field Museum of Natural History, Chicago, Ill. ALEXANDER K. HAMILTON, G. P. HU

    Jan 5, 1918

  • ABM
    Aplicação Do Modelo De Austin Para Simulação De Moinho Vertical

    By Douglas Batista Mazzinghy

    O moinho vertical normalmente é dimensionado através da aplicação de um fator de eficiência sobre o Índice de Trabalho de Bond (BWI) ou sobre o consumo específico de energia (kWh/t) obtido através de

    Aug 1, 2018

  • AIME
    Institute of Metals Division - Crystallographic Data for the Tetragonal Crystal System (TN)

    By R. E. Frounfelker, W. M. Hirthe

    INVESTIGATORS in the areas of plasticity, crystal growth, and stress analysis have a need for crys-tallographic data such as the interplanar angles. This information is utilized in the form of a stere

    Jan 1, 1962

  • NIOSH
    A Continuous Dielectric Separator For Mineral Beneficiation - Objective

    To separate complex mineral mixtures according to their dielectric properties. Approach Develop a laboratory-scale continuous dielectric separator to separate mineral mixtures by exploiting their

    Jan 1, 1981

  • AIME
    Pyrometallurgy - Agglomeration

    US 4,194,729 - Sintering of iron oxide ore on a straight sinter belt. The upper strand of the belt is divided into sintering and cooling sections with windboxes for removing their respective gases. Th

    Jan 1, 1982

  • AUSIMM
    Direct Electrowinning of Lead from Lead Sulphide Concentrates

    By Siemon J. R

    It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M

    Jan 1, 1976

  • AUSIMM
    Processing Options for Phosphate Oreswith High Fe and Al Contents

    The prospect of utilization of phosphate ores which contain high P205 values associated with Al and Fe has produced a great deal of interest over many years. Processing options have generally been bas

    Jan 1, 1990

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • AUSIMM
    Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited

    The Kennedy Siltstone Open Cut provides graded rock for stope filling. Rotary drilling of 310 mm blastholes with a Gardner Denver GD120 is used, and the successful application of an equilateral tri

    Jan 1, 1978