Search Documents

Sort by

  • AUSIMM
    Case Examples of Stability on Surface Mining Projects

    Stability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go

    Jan 1, 1986

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • AIME
  • AUSIMM
    Detailed Underground Measurements of Roof Deflection and Bed Seperation

    By Prohaska G, Jackson F, Jack B

    To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and

    Jan 1, 1992

  • CIM
    Good International Practices Made Better IFC Raises the Bar on Environmental Health & Safety for the Mining Sector

    By Audrey Wagenaar

    Introduction ?? Rising public pressures are being placed on companies worldwide to protect the environment and the health and safety of their workers and local communities. ?? International bodies

    May 1, 2008

  • AUSIMM
    The Cadjebut Zinc Operation

    The Cadjebut Mine is located 80 km southeast of Fitzroy Crossing. Cadjebut is owned 58 per cent by BHP Minerals and 42 per cent by Billiton Australia. Cadjebut is a 'Mississippi Valley Type&apo

    Jan 1, 1992

  • NIOSH
    RI 8022 - Geologic Investigations Of Underground Coal Mining Problems

    By P. W. Jeran, C. D. Sullivan, C. M. McCulloch

    A series of geological surveys were completed in six coal mines in connection with a Bureau of Mines research program on methane control. The aim of these surveys was twofold: First, to study the over

    Jan 1, 1975

  • CIM
    The 425 Project - Dealing with SO2

    By Éric Côté

    Introduction The 425 Main Ore Zone ? Block of ore partially mined in the late sixties; ? Area was sealed off for over 30 years due to SO2 emissions from oxidizing fill material; 425 Project goal

    Feb 1, 2008

  • AIME
  • IIMP
    Control de procesos de muestreo (QA/QC) enla estimación de recursos y reservas para el yacimiento epitermal de Coimolache - Cajamarca

    By Juver Vélez

    El presente trabajo señala los controles QA/QC como herramientas que cuidan el proceso de muestreo en la industria minera, de forma que su resultado determina la calidad de su planeamiento a corto y l

    Oct 21, 2015

  • AUSIMM
    Load Transfer Mechanisms in Reinforcing Tendons

    By Tarrant GC

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon

    Jan 1, 1992

  • NIOSH
    RI 8733 Recovery of Sulfur and Accessory Metals From a Leaching Process Residue

    By K. P. V. Lei

    The Bureau of Mines as part of its research effort to minimize the generation of hydrometallurgical waste, investigated a sodium sulfide leaching-electrolysis procedure for treating hydrometallurgical

    Jan 1, 1982

  • SME-ICGCM
    The Use Of Geologic Modeling In The Prediction Of Adverse Roof Conditions

    By Edward S. Custer

    Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional

    Jan 1, 1981

  • AUSIMM
    Feasibility of in-Pit Crushing and Conveying of Waste Rock at Mt Whaleback Mine

    By Hedge AS

    Mt Whaleback is one of the largest open-cut iron ore mines in the world. Haulage cost is the single largest component of operating costs at the mine. Past studies towards alternatives to truck hau

    Jan 1, 1986

  • AIME
    Laboratory Method For Determining The- Capacities Of Slime-Settling Tanks

    By H. S. Coe

    ENGINEERS have long recognized the desirability of correlating the data obtained from small-scale slime-settling tests with commercial work as carried on in large tanks. This need, though most apparen

    Jan 3, 1916

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • SME
    Computer Controlled Jumbos. State Of The Art.

    By Thorvald Wetlesen

    Computer controlled drilling is now proven technology. It was first introduced by the development of the Furuholmen system for a prototype three boom tunneling jumbo in Norway in 1978. Now, 13 rigs wi

    Jan 1, 1989

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • AUSIMM
    The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

    By Matsuo T, Uga Y

    The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec

    Jan 1, 1987

  • AIME
    MiscelIaneous - Flow of Gas through Coal (With Discussion)

    By V. F. Parry, S. P. Burke

    The presence of gas in coal mines necessitates the use of costly ventilation arrangements and the use of expensive mining methods. On the other hand, the gas itself in many instances is of considerabl

    Jan 1, 1936