The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

The Australasian Institute of Mining and Metallurgy
Matsuo T Uga Y
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
1043 KB
Publication Date:
Jan 1, 1987

Abstract

The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spectrum) TBM with slurry transport system with jet pump manufactured by Kawasaki Heavy Industries, Ltd. Boring dia. of the tunnel measured to 2.0 m. The construction planning and implemen- tation were done by Ohbayashi Corporation, the general contractor. The heading way was 3342.4 m in overall length.; construction work ran from April '84 to June '85. The max. daily progress marked 31.9 m and the max. monthly progress 493.1 m according to the relevant record. The machine proceeded with the work under geological conditions featured with conglomerate, rhyolite, tuff breccia and slate, whereby soft soil zone mostly of clay was encountered in a limited area. In the latter case, however, steel segments were substituted for supporting steel ribs. The tunnel was routed beneath a meandering road with the result that more than 40% of overall length show a curvature of 50 to 200 m radius.
Citation

APA: Matsuo T Uga Y  (1987)  The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

MLA: Matsuo T Uga Y The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System. The Australasian Institute of Mining and Metallurgy, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account