Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mineral Needs of a World at WarBy JOHN R. SUMAN
IT appears now that the conflict with the totalitarian states will be a long-drawn-out struggle. The course of this war up to now indicates that this may well be the first major conflict where man pow
Jan 1, 1942
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
A Tunneled Solution for the Cemetery Brook Drain in Manchester, New Hampshire - NAT2022By Frederick McNeill, John Harper, Mahmood Khwaja, Shawn Lavoie, Timothy Cloughert, David Polcari
City of Manchester, NH, is implementing a 20-year plan to control and significantly reduce overflow of its sewer system. The long-term control plan had called for large scale box culvert installation
Dec 1, 2022
-
Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel
With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co
Dec 1, 2022
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
The State of DRB’s in the Tunnel Industry - NAT2022By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham
Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the
Dec 1, 2022
-
Outlook for World Consumption of Metals and FuelsBy A. B. Parsons
AT the outset, the authors of this paper desire to file a disclaimer and an, explanation. They have no inside information from occult sources; neither of them feigns clairvoyant powers in the slightes
Jan 1, 1937
-
Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)By J. Cayouette, C. Bolduc, P. Blatter
"The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext
Jan 1, 2017
-
Geology and Mining of the Tin-Deposits of Cape Prince of Wales, AlaskaBy Albert Hill Fay
IN giving a sketch of the geology and mining of the tin-deposits of Cape Prince of Wales, a short description of the geographic and climatic conditions may be of special interest on account of this be
Sep 1, 1907
-
Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NYBy Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand
"The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The
Jan 1, 2016
-
Regional Meeting and Engineers' Week at ChicagoBy Carl Lee
CHICAGO in the last week of June fulfilled all its promises to the visiting engineers except one. This holds true with respect to the activities of the Regional Meeting of the A. I. M. E. in particula
Jan 1, 1933
-
Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
In situ study of mineral liberation at the onset of fragmentation of a copper ore using X-ray micro-computed tomographyBy R W. Henley, L Knuefing, M Turner, Y Zhang, M Saadatfar, A Limaye, R Cruikshank, M A. Knackstedt, A Kingston, L Beeching, N Francois
A better understanding of ore fragmentation and the textural features of ore is a key to the energy efficient extraction of targeted minerals from low-grade ore deposits. In this study, X-ray microcom
Aug 24, 2022
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022By Jeremy Stone, Yiming Sun, John Stolz
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc
Dec 1, 2022
-
Design of Pile Foundation for Tall Railway Bridges in North-East IndiaBy Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
Canada's Newest Asbestos Producer -Advotote Mines limitedBy J R. M Hutcheson
Advocate Mines Limited came into initial production on June 30, 1963, with an annual capacity in excess of 60,000 tons of high-quality chrysotile asbestos fihres, thus strengthening Canada's posi
Jan 1, 1965
-
Iron Purification at Teck Cominco's Trail OperationsBy W. A. Jankola
Teck Cominco Metals Ltd. operates an integrated zinc-lead smelter at Trail, British Columbia, Canada. The zinc circuit comprises three parallel operations: conventional fluid-bed roasting, direct zinc
Jan 1, 2006
-
Washington Paper - Distribution of the World's Production of Pig-IronBy John Birkinbine
Secretary's Note.—In printing this paper in the present volume, the figures given in the pamphlet edition have been brought more nearly up to date, the product of 1899 being in many instances ins
Jan 1, 1901
-
Discovery And Development Of Peabody Coal Company's Black Mesa MineBy John M. Arnold
Several years ago it became apparent to some of our people that; there was developing a very definite need for largee coal reserves in the West to satisfy- the need for fuel for the furnaces of electr
Jan 1, 1969