Search Documents

Sort by

  • CIM
    Autogenous grinding mills for diamond liberation

    By J. E. Danoczi

    ABSTRACT A diamond processing plant is being designed for the Star–Orion South diamond project in central Saskatchewan. Key to the plant is diamond liberation, which occurs in the comminution section

    Jan 1, 2013

  • CIM
    Mechanical Properties of Ultra Fine Precipitation Hardened Hot Rolled High Strength Steel

    By Yoshimasa Funakawa, Kazuhiro Seto, Akio Kobayashi

    A new hot rolled high strength steel consisting of ferrite matrix and nanometer¬sized precipitates was developed. The ultra fine precipitates were identified as TiMoC2, and the strengthening by the pr

    Jan 1, 2004

  • SME
    Principal Conclusions Of The Committee On The Challenges Of Modern Society Non-Electrical Applications Project ? Purpose

    By J. H. Howard

    The purposes of this report are to summarize the findings of the Committee on the Challenges of Modern Society Non-electrical Project (a working committee of the North Atlantic Treaty Organization) an

    Jan 1, 1975

  • IMPC
    Study on Film-magnetic Separation Technique for JISCO Iron Materials

    By L. Q. Luo

    SHP-F3200 wet high-intensity magnetic separator (HIMS) was successfully used to separate the complex and weakly magnetic iron ores being composed of specularite, limonite and siderite in Ji-uquan Iron

    Jan 1, 2014

  • CIM
    Excavation Damage, and Water and Gas Migration in an Inherently Anisotropic Argillaceous Rock Formation

    By D. A. Le, T. S. Nguyen

    "In Canada and other countries, several types of rock formations are being considered for the geological disposal of radioactive wastes. In order to better understand the ability of these rocks to con

    Jan 1, 2015

  • CIM
    Mineralogy and pre-concentration of the chromite overburden of the Sukinda Ultramafic Belt, Orissa, India

    By R. B. Rao, B. Das, J. K. Mohanty, D. S. Rao

    Physical, mineralogical and geochemical characterization, along with some beneficiation approach to pre-concentrate the Ni content of the chromite overburden material of the Sukinda Valley, India, hav

    Jan 1, 2000

  • SME
    Shiftable Belt Conveyor Systems In Open Pit Mining - I. Introduction:

    By Jurgen Weissflog

    Why, where and since when using shiftable conveyors? Advantages of this equipment The ever increasing demand for bulk materials such as ore, coal, lignite, oilsand, oilshale and bauxite requires ma

    Jan 1, 1983

  • AUSIMM
    Epithermal Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone, New Zealand

    In the Ngakuru area, zeolite deposits occur in late Quaternary lake sediments and ignimbrites. The deposits are associated with sinters, hydrothermal eruption breccias, and quartz-adularia altered fau

    Jan 1, 2002

  • AIME
    Minerals Beneficiation - Development of Metallurgical Practice at Tsumeb

    By J. N. Ong, J. P. Ratledge, J. H. Boyce

    SINCE German operators opened the Tsumeb mine in the early 1900's, continuous operation has been interrupted only by enforced shutdowns during two world wars and the depression of the 1930's

    Jan 1, 1956

  • NIOSH
    Stope Design Considerations Using Rock Mass Classification Tools At The Xstrata Zinc George Fisher Mine

    By Jeremy P. Doolan, Leigh B. Neindorf, Geoff W. Capes

    The development and use of rock mass classification tools have been a key component for improving stope design over the past 4 years at the Xstrata Zinc George Fisher Mine in northern Queensland, Aust

    Jan 5, 2007

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006

  • CIM
    Geological Modeling and Estimating Recoverable Reserves in Vietnam

    By Vu Van Dong

    Resource estimation is the science of determining the amount and quality of a given material in the ground that has the potential to be mined at a profit. This is because during this time computers ha

    Oct 1, 2009

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME
    Technical Note - Steep-Angle Conveyor For Bulky Run-Of-Mine Ore

    By K. Mulukhov

    Introduction The depth of open-pit mines continues to increase. The typical designed depth for large quarries is now in the 300 to 600 m (1,000 to 2,000 ft) range, with some quarries even reaching de

    Jan 1, 2003

  • SME
    Modeling The Eastern U. S. Steam Coal Market

    By Walter C. Labys

    This paper reports on recent modeling efforts to analyze the eastern U.S. steam coal market with a cross-sectional econometric as well as a quadratic programming approach. The background to coal model

    Jan 1, 1979

  • NIOSH
    RI 9185 - Dimensional Changes of Select Ceramic Materials Exposed to HCI, HN03, and H2S04 Acid Environments

    By J. P. Bennett

    The Bureau of Mines investigated the dimensional changes of ceramic materials exposed to acid environments to evaluate construction materials for emerging technology in chemical and metallurgical proc

    Jan 1, 1988

  • IIMP
    Influencia de las alteraciones hidrotermales en la estabilidad de un tajo abierto minero del sur del Perú: estudio de caso

    By Sergio Castro

    Los modelos geotécnicos disponibles suelen estar basados en las litologías existentes, sin considerar el impacto de las soluciones hidrotermales en las rocas y, por tanto, en la estabilidad de los tal

    Jun 30, 2020

  • SAIMM
    PGM Recovery from a Pregnant Leach Solution Using Solvent Extraction and Cloud Point Extraction: A Preliminary Comparison

    By L. Makua, K. Langa, Ndlovu. S., C. Saguru

    "Global demand for the three platinum group metals (PGMs) Pt, Pd, and Rh has been steadily growing due to their widespread use in emission control, industrial catalysis, and numerous other application

    May 1, 2019

  • SME
    The Effect Of Cathodic Polarization On The Floatability Of Chalcopyrite I. In The Absence Of Oxygen

    Rest potential, cyclic voltammetry and chronoamperometry measurements were made to study the effects of cathodic polarization of chalcopyrite simulating the mineral contacted with grinding media under

    Jan 1, 1991