Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere
Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho
Jun 13, 2023
-
CMGC Delivery of the I35W SSF Project— Fostering Collaboration to Meet Stormwater System Resiliency Challenges - RETC2023By M. B. Haggerty, Joe Welna
The Minnesota Department of Transportation is constructing a stormwater storage facility (SSF) along Interstate 35W (I35W) south of downtown Minneapolis, MN. The project will provide storm surge capac
Jun 13, 2023
-
Metropolitan Water Tunnel Program in Massachusetts - RETC2023By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh
Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o
Jun 13, 2023
-
Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines
The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023By Doug Harding
The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single
Jun 13, 2023
-
Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023By Ryan Ward
The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans
Jun 13, 2023
-
SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023By Denis Tepavac, Mark Trim
Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design
Jun 13, 2023
-
TBM Tunnel Offshore Connection - RETC2023By H. Vigil Fernandez, G. Peach
The Musaimeer pump station and outfall project located in Doha Qatar, was designed to collect and manage ground and stormwater and then discharge the treated waters offshore. The project constructed a
Jun 13, 2023
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Corrosion and Leakage Remediation for WMATA Yellow Line Steel Tunnels - RETC2023By Tatiana Kotrikova, Steven Kolarz, Alan Kolodne, James Parkes, Matthew Goff
The WMATA Yellow Line is the section of steel segmentally lined tunnels that have experienced leakage and significant corrosion in isolated areas. A three part rehabilitation design has been developed
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023
-
Cohesive Soil Conditioning Practice for Earth Pressure Balance Tunneling - RETC2023By Diana Diaz, Rakshith Shetty, Vitaly Proschenko, Mike Mooney
Cohesive clay soil poses a significant risk to earth pressure balance tunnel boring machines (EPBM) due to unstable face pressure, clogging potential, high cutterhead torque, poor muck flow, low advan
Jun 13, 2023
-
Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023By Laurent Rus, Bakar Amara, Jean Habimana
The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life
Jun 13, 2023
-
Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023By Dan Ifrim, Andre Solecki
Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo
Jun 13, 2023
-
Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt
This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne
Jun 13, 2023
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine
The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion
Jun 13, 2023