TBM Tunnel Offshore Connection - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 227 KB
- Publication Date:
- Jun 13, 2023
Abstract
The Musaimeer pump station and outfall project located in Doha Qatar, was designed
to collect and manage ground and stormwater and then discharge the treated waters
offshore. The project constructed a long outfall tunnel using an EPB TBM with segmental
lining, each tunnel ring being 1.35 m in length with an internal diameter of
3.7 m.. The diffuser structure was a 6-arm structure, measuring 294m by 40 m connected
to a central manifold in turn connected to the TBM constructed tunnel via a
riser shaft drilled from an off-shore barge. This technical paper will discuss the planning,
methodology and construction practices employed to connect the TBM tunnel to
the diffuser structure 10.2 km offshore.
Citation
APA:
(2023) TBM Tunnel Offshore Connection - RETC2023MLA: TBM Tunnel Offshore Connection - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.