    Quality Control of Deep Bedrock Tunneling in Urban Areas: A Case Study of Louisville MSD’s Ohio River Tunnel - NAT2024

    By Jacob Mathis, Mark Bradford, Alston Noronha, R. M. True

    In June 2022, Louisville MSD completed a 6.5-km (4.0-mi), 6.1-m (20-ft.) diameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. For large diam

    Jun 23, 2024

  • SME
    Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024

    By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka

    The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin

    Jun 23, 2024

  • SME
    Mitchell Point Tunnel, Oregon—Design and Construction - NAT2024

    By Taeyong Lee, Cole Bales, Matt Fowler, John Horne

    Mitchell Point Tunnel near Hood River, Oregon is one of the more unique segments of the Historic Columbia River Highway and State Trail being constructed through the Columbia River Gorge. This 650-foo

    Jun 23, 2024

  • SME
    Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024

    By Bernd Hagenah, Eric C. Wang

    New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons

    Jun 23, 2024

  • SME
    West Gates Deicing Industrial Waste Pond Expansion Project: Tunnel Design Challenges at Denver International Airport - NAT2024

    By Nick Tessitore, Ryan Marsters, Alex Warren, Dylan Fawaz

    The West Gates Deicing Industrial Waste Pond Expansion project at Denver International Airport seeks to expand utilities to accommodate additional terminal gates. The project includes six tunnel cross

    Jun 23, 2024

  • SME
    Evolving Underground Communication and Connectivity - NAT2024

    By Tom Michaud, Rob Albinger, Ian Turner, Michael Rispin

    Data transmission, communication, tracking, and the connection of equipment such as gas detectors, cameras, and collision avoidance systems in today's tunnel industry are critical pieces of the constr

    Jun 23, 2024

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024

    By Botond Beno, Dave Watson, Danny Read

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing I-64 four-lane bridge-tunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge

    Jun 23, 2024

  • SME
    Holding Back the Bay: Performance of Jet Grout in Hydraulically Placed Fills - NAT2024

    By Roger Escoda Estelrich, Joan Carles Casado Ortega, Mitchell Gerdau, Jose Raul Martinez, Jeb Pittsinger, Frank Perrone

    The existing Chesapeake Bay Bridge-Tunnel complex is being expanded to include the Parallel Thimble Shoal Tunnel. This will be a subaqueous bored crossing between two islands constructed for the origi

    Jun 23, 2024

  • SME
    Subsea Tunnel Geotechnical Investigations Pre and Post Contract Award-A Plan for Success - NAT2024

    By Gary Peach, Khalid Saif Al-Khayareen, Vigil Fernandez, Furqan Hameed

    The Musaimeer pump station and outfall project (MPSO) is in Doha Qatar. This technical paper will discuss and explain the three major stages of geotechnical investigation employed. Stage one the tende

    Jun 23, 2024

  • SME
    Microtunneling to the Rescue: Increasing Capacity and Replacing Aging Interceptor Sewers Due to Rapid Growth in Irving, Texas - NAT2024

    By Amanda Powers, Brian Glynn, Robert Sauceda, Daniel Huffines, Mike Garbeth

    This paper will review the evaluation performed for the Cottonwood & Hackberry Creek Wastewater Interceptor Improvements Project to replace two separate aging and undersized interceptor sewers by eith

    Jun 23, 2024

  • SME
    Preliminary Ground Characterization for the Mokelumne Aqueducts Resiliency Project (MARP) Tunnel - NAT2024

    By S. Klein, M. McLeod, S. Gambino, K. Johnson, E. O’Hara

    The Mokelumne Aqueducts Resiliency Project (MARP) involves construction of a 16.5-mile tunnel across the Sacramento-San Joaquin Delta (Delta) to replace the existing surface aqueduct pipelines with mo

    Jun 23, 2024

  • SME
    Microtunnel Shaft Construction in Louisiana - NAT2024

    By James Carroll, Lance Heyer

    This paper describes the shaft design and construction for a 72-inch microtunnel under 14 active railroad tracks in Avondale, Louisiana. Initial shaft design for a deeper tunnel alignment considered s

    Jun 23, 2024

  • SME
    Multimodal Machine Learning Technologies in Tunnel Geotechnical Applications - NAT2024

    By Gunjan R. Bhattarai, K. Bhattarai

    Applications of machine learning and robotics in the tunneling industry are still nascent. Research and development are ongoing in TBM guidance; prediction of TBM cutter wear and tunneling induced gro

    Jun 23, 2024

  • SME
    The Upper Hidden Basin Diversion Project Design and Construction at Terror Lake—Kodiak, Alaska - NAT2024

    By Jennifer King, Julius Strid, Steve Brandon

    The Upper Hidden Basin Diversion (UHBD) tunnel was driven approximately 1.2 miles by the drill-and-blast method primarily through massive granite bedrock geology for the Kodiak Electric Association, I

    Jun 23, 2024

  • SME
    TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara

    This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv

    Jun 23, 2024

  • SME
    The Anomalies of the Purple Line Extension, Section 1, Los Angeles - NAT2024

    By James Corcoran, Richard McLane, Joseph DeMello, Eric Carlson, Hans van de Vrugt

    The Los Angeles County Transportation Authority’s Purple Line Extension Phase 1 is a $3.12 billion (USD) design-build, underground heavy rail project, connecting an existing station at Wilshire Boulev

    Jun 23, 2024

  • SME
    Risk Assessment and Large Diameter Segmental Lining Design in Swelling Ground - NAT2024

    By Carlos Álvarez, Sergio Sánchez, Michael Mains, Giuseppe Gaspari

    Extensive record of tunnels excavated with SEM (sequential excavation method) in swelling grounds exists in literature: global experiences include successful tunnelling both through clayey and rock ma

    Jun 23, 2024

  • SME
    Tunneling Through Reef Structures: Identification, Characterization, and Potential Impacts - NAT2024

    By Jon Ike Isaacson, Michael Miller, Jarek Trela

    Despite reef structures being relatively common in carbonate rocks around the world, tunneling experience in reefs is extremely rare. Impacts and risks associated with reef tunneling through these geo

    Jun 23, 2024

  • SME
    A 108-in Storm Tunnel Underneath Active Taxiways and Apron at O’Hare International Airport - NAT2024

    By Tim M. Benson, Adam L. Lamanna, Carolina Martinez-Gutierrez, Mark J. Stephani

    The Lower Concourse C Extension (LCE) 108-in Storm Sewer consists of a 2,797-foot long, 27 to 55-foot deep, 108-in I.D. storm sewer tunnel. Situated beneath active taxiways and a terminal apron at Har

    Jun 23, 2024