Search Documents

Sort by

  • SME-ICGCM
    Correlation Between The Effect Of Confining Pressure On Compressive Strength In Triaxial Tests And The Effect Of Diameter/Height Ratio On Compressive Strength In Unconfined Compression Tests

    By Venkata S. Vutukuri

    Compressive strength of cylindrical specimens of a model material and sandstone with various diameter/height (d/h) ratios was determined in unconfined compression tests. It was observed that the compr

    Jan 1, 1993

  • AUSIMM
    The Health and Safety in Employment Act 1992

    The need for legislative reform of health and safety legislation has been recognised in New Zealand for about a decade. Previous legislation did not cover all work places, many areas were excluded fro

    Jan 1, 1993

  • ISEE
    48 Inch Production Blast Holes in Oilsands

    By Michael McDougall

    "Suncor Inc. Oilsands Group, Mining Operation in Northern Alberta, Canada, has beenblasting to loosen the oilsands to increase production and decrease maintenance of the hugebucketwheel excavators for

    Jan 1, 1993

  • SME
    Coal Waste Reclamation: Acid Seep Prevention And Abatement

    By J. R. Nawrot

    Reclamation of potentially acid producing coal processing waste requires a 4-foot cover, and/or treatment to allow vegetation establishment. If not planned properly, soil covering alone does not preve

    Jan 1, 1993

  • TMS
    Acid Plant Size Determination for a Modern Copper Smelter

    By Irshad A. Rana

    In a modern copper smelter, the capital cost of a sulfuric acid plant constitutes the largest single cost item of the total investment. It is thus essential to properly size the acid plant in order to

    Jan 1, 1993

  • SME
    A Method Of Designing Auxiliary Ventilation Systems For Long Single Underground Openings

    By Pierre Mousset-Jones, Felipe Calizaya

    The design of an auxiliary ventilation system for long underground openings (drifts, ramps and shafts), often requires the installation of multiple fans. The fans are installed in series and separated

    Jan 1, 1993

  • AUSIMM
    A New Macrophenomenological Concept of Comminution in Ball Mills

    Grinding is probably the single unit operation that requires the largest capital investment and operating costs in an ore beneficiation plant. Because of that, a great deal of research has been conc

    Jan 1, 1993

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    Process Developments in Pressure Die Casting of Zinc Alloys - Towards the Year 2000

    Zinc alloy castings continue to account for a very large, world-wide end-use market for zinc. However, an ever expanding multitude of other materials and processes are increasingly providing viable,

    Jan 1, 1993

  • AUSIMM
    The Resource Management Act - A Rich Seam for the Mining Industry

    Recent legislation in the environmental field gives the mining industry an opportunity to take timely action to address its image. Shifting the focus away from mining (the activity) to minerals (the r

    Jan 1, 1993

  • TMS
    A New Matched Themochemical Diagram for Vacuum Refining of Nickel and Cupronickel Alloys

    By Sridhar Seetharuman

    Sulfur and oxygen dissolved in nickel and cupronickel melts can be removed as gaseous oxides of sulfur by a vacuum treatment. Presented in this paper is a new matched thermochemical diagram that permi

    Jan 1, 1993

  • SME
    Blast Fragmentation Model Evaluation Via Image Analysis

    By Martin L. Smith, John M. Kemeny

    In blasting, an optimal muckpile size distribution can be found in terms of mining and milling productivity and cost. Fragmentation control requires a means of modeling and evaluating blast results. A

    Jan 1, 1993

  • NIOSH
    Mineral Resource Investigation Of The Garfield Mountain Study Area, Clark County, Idaho

    By Frank E. Federspiel

    In 1992, the Bureau of Mines conducted a mineral resource investigation of the 19,200-hectare Garfield Mountain study area in east central Idaho. The area had been proposed for Wilderness. Cretaceous-

    Jan 1, 1993

  • SME
    Requirements and Stringent Specifications for Braking Systems on Regenerative Conveyors

    By Jean-Luc Cornet

    Downhill, or regenerative conveyors have always been a challenge to the design engineer due to their natural instability under load. The last decade has seen the appearance of high tonnage, high negat

    Jan 1, 1993

  • SME
    The Feasibility Of Collectorless Sulphide Flotation

    By N. Arbiter

    Evidence for the floatability of sulphide minerals without collector is analyzed and it is shown that results obtained with ores, in contrast to those with single minerals or mineral mixtures, depend

    Jan 1, 1993

  • NIOSH
    Availability Of Data (0dbdd8c7-2693-4c47-adeb-dd9d3e5fbecd)

    By Charles L. Kimbell

    Following the pattern established in the 1989 edition of this study, the concept of data availability must be addressed, because there are perceptible changes from year to year, and the availability o

    Jan 1, 1993

  • NIOSH
    Prices (f8099d14-7d89-45a2-bfd2-d63012b53173)

    By Charles L. Kimbell

    The series summarizing the prices of the major nonferrous metals on the stock exchanges of the United States and the United Kingdom has been continued this year in tables 23 and 24. Time constraints h

    Jan 1, 1993

  • AUSIMM
    Quantum Chemical Approach to the Adsorption of Mercaptobenzothiazole on Pyrite by the Molecular Orbital Method

    By Hayashida O, Numata Y

    Ultraviolet and infrared spectroscopic analyses and the extended lluckel molecular orbital method were applied to determine the electronic and binding states of 2-mercaptobenzothiazole and the adsor

    Jan 1, 1993

  • SME
    The Fort Lawton Parallel Tunnel Seattle, Washington

    By Brian Fulcher

    The Fort Lawton Parallel Tunnel was built in 1990 - 1991 by Morrison Knudsen Corporation (MK) as an integral part of Seattle METRO's planned expansion of the Westpoint Treatment Plant. The projec

    Jan 1, 1993

  • ISEE
    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993