Search Documents

Sort by

  • TMS
    Ground Granulated Blast Furnace Slag as a Cementitious Material

    By F. J. Hogan

    In early 1982 Atlantic Cement Company, a wholly-owned subsidiary of Newmont Mining Corp. will come on line with a new water granulating grinding facility at Sparrows Point, Maryland to produce 800, 00

    Jan 1, 1982

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • DFI
    Ground Improvement by a Combination of a Mixed-In-Place (MIPTM) Lattice Grid Wall and Stone Columns to Mitigate the Risk of Liquefaction and Lateral Spreading

    By Noreen Tarac, Pablo Forgoso, Philipp Schober

    A multiple use storage facility building is being developed in the Philippines on a peninsula that was reclaimed in the 1990s without any soil treatment. The subsoil now consists of loose to medium de

    Sep 8, 2021

  • DFI
    Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - Summary

    By Peter White

    A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat

    Jan 1, 1997

  • DFI
    Ground Improvement By Controlled Modulus Columns - A San Pedro Case Study

    By Sunil S. Basarkar, Vinothkumar S

    Ground Improvement Techniques serves to improve various engineering properties for supporting various foundations. These may be undertaken either by conventional or advanced methods. The Controlled Mo

    Sep 1, 2022

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In Turkey

    By Alp Gokalp

    The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p

    Jan 1, 2002

  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Ground Improvement By Stone Columns At Formosa Plant Taiwan And Its Earthquake Response

    By Wolfgang G. Brunner

    Mai- Liao, in Yun Lin province of Taiwan, which was once a remote area on the coast of the South China Sea, has been developed into an offshore industrial complex. Approximately 100 million m3 of impo

    Jan 1, 2002

  • DFI
    Ground Improvement Design and Construction for Seattle’s Elliott Bay Seawall Replacement and Retrofit

    By Andrew Malinak, William Perkins

    Seattle’s Elliott Bay Seawall protects the 1½ miles of downtown waterfront between South Washington and Broad streets. The seawall supports the urban waterfront and infrastructure, including the Alask

    Jan 1, 2018

  • DFI
    Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study

    By M. Kumaran, A. Vetriselvan, A. Purantharan

    "This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con

    Jan 1, 2017

  • SME
    Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023

    By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan

    The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J

    Jun 13, 2023

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case Study

    By Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu

    Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi

    Nov 1, 2022

  • DFI
    Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge Foundation

    By Aly M. Mohammad

    Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur

    Jan 1, 2007

  • SME
    Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022

    By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh

    The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper

    Dec 1, 2022

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • AIME
    Ground Monitoring Program for Pillar Reduction at the Tanco Mine

    By G. W. R. Kuzyk, John D. Smith

    Tantalum Mining Corporation of Canada Limited has been mining tantalum ore from the Bernic Lake pegmatite dyke since 1968. The shallow nature of the dyke and relatively high strengths of the various r

    Jan 1, 1983