  • AIME
    Feasibility of Volumetric Coal Estimation by Trend-Surfaces: Harbour Seam of Sydney Coalfield, Cape Breton Island, Nova Scotia, Canada

    By S. Forgeron, W. Shaw, E. L. Zodrow

    Trend-surface equations are proposed for volumetric coal estimation in collieries of Sydney Coalfield, Nova Scotia. The statistical technique was first tried on Harbour coal in #20 Colliery investigat

    Jan 1, 1983

  • AUSIMM
    Feasibility Studies - Scope and Accuracy

    Feasibility is a value improvement process for projects. At any stage in project development, a feasibility study can be undertaken, but although the scope generally remains unchanged the extent of

    Jan 1, 1997

  • CIM
    Feasibility Studies CIM Vancouver 2010

    Some Statistics ? Feasibilitystudiescostbetween2% & 3% of capital andrequire8% to15% of total engineering effort ? Feasibilitystudiesusuallytakebetween8 and16 months ? Historically more than80% of

    May 1, 2010

  • SAIMM
    Feasibility studies of the on-stream analysis of lead in mineral slurries

    By S. K. Kawatra

    Feasibility studies of the on-stream analysis of lead in mineral slurries by S. K. KAWATRA. P. Eng. (Canada). Ph.D. (Australia). M.Sc. (India) (Visitor) Instruments for the measurement of lead in mine

    Jan 8, 1976

  • AUSIMM
    Feasibility Studies – What Should Be Considered in Terms of Ventilation

    By J Kok

    "In some underground mines it has been observed that the primary focus during feasibility studies is to determine the best way to mine the defined orebody. Some studies have been conducted without suf

    Mar 24, 2014

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • SME
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • AUSIMM
    Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore Deposit

    By H Dehghan Jan Abadi, K Shahriar

    The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i

    Jan 1, 2007

  • CIM
    Feasibility Study and Optimization of Dissolution of Vanadium from Mining Residue via Biological Approach

    By H. Gharahbagheri, S. Shafiei Zadeh, H. Hassan Nejad, Reza Roostaazad

    In this paper, dissolution of vanadium from mining residue, in which vanadium is associated intimately with magnetite ore, was investigated via both bacterial ( aerobic and anaerobic) and fungal activ

    Jan 1, 2014

  • AUSIMM
    Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold Mine

    By El-Ansary M

    Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely

    Jan 1, 1987

  • AUSIMM
    Feasibility Study for a Silicon Industry in Southland

    By D S. Nicholson, T Marshall

    Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • AUSIMM
    Feasibility Study for a Silicon Industry in Southland, New Zealand

    Reserves of high-grade quartz gravel, lignite, and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • AUSIMM
    Feasibility Study for a Solution Industry in Southland

    By Marshall T, Nicholson DS

    Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • IMMS
    Feasibility Study For Crust Mining In The Marshall Islands.

    By Yoshio Masuda

    Cobalt-rich crust in rich Co, Ni, Mm and Pt will be a potential resources for island country such as Republic. Marshall Islands. This study was conducted for Marshall Islands by the President Kabua?s

    Jan 1, 1991

  • SME
    Feasibility Study Of Applying Geostatistics To Coal Washability Data ? Introduction

    By Young C. Kim

    Use of geostatistics to solve mining problems is gaining importance as the cost of developing new mines is increasing and there is a need to mine more marginal deposits. But, until recently, coal comp

    Jan 1, 1982

  • SAIMM
    Feasibility study of electricity generation from discard coal

    By A. Engelbrecht, B. North, B. Oboirien

    "There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d

    Jan 1, 2015

  • SAIMM
    Feasibility Study Of Replacing Bottom Dump Trucks With Rear Dump Trucks At Kleinkopje Colliery

    By T. Tamenti

    The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi

    Jan 1, 2007

  • SAIMM
    Feasibility study of replacing bottom dump trucks with rear dump trucks at Kleinkopje colliery - Synopsis

    By T. Tamenti

    The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi

    Jan 1, 2007

  • ABM
    Feasibility Study Of The Production Of Iron Ore Tailings And Coking Coal Aglomerates For Use In Reduction Reactors

    By Paula Maria Gomes Cunha Leão, Flávio de Castro Dutra, Fabrício Vilela Parreira, Silvio Maranha

    In the iron ore beneficiation, tailings are inherent in the concentration processes to which the ores are subjected for the production of commercial products. The large generation of tailings has been

    Oct 1, 2019