Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mill Expansions at PT Freeport IndonesiaBy Robert L. Russell
Production at Freeport Indonesia's Ertsberg open pit copper-gold mine started in 1972 at a rate of 7.5 kt/d (8270 stpd). Mill throughput remained at that rate for several years until the discover
Jan 1, 1994
-
Cut-and-Fill Stoping at Lucky Friday MineBy Staff
GENERAL DESCRIPTION The Lucky Friday mine is located in Mullan, Sho-¬shone County, Idaho. The mining method is horizontal slice cut-and-fill (with timbering for support or un¬timbered) using hydrauli
Jan 1, 1982
-
Manganese And Copper Removal From Leachates Using Slag And Red Mud Reactive BarriersBy I. Fafoutis
Laboratory column studies were conducted in order to assess the effectiveness of slag and red mud reactive barriers for cleaning up leachates generated at mining and waste disposal sites and loaded wi
Jan 1, 2006
-
Political Metallurgy: "Sandbagging" Versus Prudent Caution, and Other Political ConsiderationsBy John O. Marsden
The project development metallurgist is faced with an interesting dilemma: The use of overly conservative metallurgical projections and cost estimates can kill a project that has the potential to prov
Jan 1, 2001
-
Using The Hotelling Valuation Principle To Value Developed Gold ReservesBy J. H. White
It is hypothesized that the Hotelling valuation principle (HVP) can determine the value of developed gold reserves using simple methods and easily obtainable data. This paper reports the results of an
Jan 1, 1997
-
Mining Management Issues Today And TomorrowBy Leonard Harris
Mining is a business and, therefore, is expected to make profit for its investors, like any other business. It is a risky business which requires the expertise of professionals from several discipline
Jan 1, 1993
-
Spontaneous Combustion Experience at Cyprus Shoshone Coal MineBy Thomas H. Koenning, James R. Boulton
The coal mined by Cyprus at the Shoshone mine near Hanna, WY is highly susceptible to spontaneous combustion. Spontaneous heatings have occurred in the gob of several of the longwall panels and, in so
Jan 1, 1997
-
Biologically Assisted Control of Selenium in Process Waste WatersBy D. M. Larsen, K. R. Gardner, P. B. Altringer
The Bureau of Mines, U.S. Department of the Interior, is conducting batch and small- scale continuous laboratory studies on the biologically assisted removal of selenium from process waste waters. Mix
Jan 1, 1989
-
Physical Limnology Of Existing Mine Pit Lakes (b143b112-b515-47b2-900c-ecab69e304fc)By G. A. Doyle
The quality of water in mine pit lakes depends in part on the physical limnology, including such factors as thermal and chemical stratification, turnover and the development of anoxic conditions with
Jan 1, 1997
-
Performance Review of Keyless Locking Assemblies in a High Capacity Slope Belt ApplicationBy Tim Wolf, Barry Fink
Mine site managers reported occurrences of locking assembly bolt failures on the Enlow Fork Coal Mine's slope belt conveyor. The observations were made after a number of years of operation and ra
Jan 1, 2002
-
2. Maintenance Information Systems - Maintenance Philosophy - Overview Of Goals And Objectives - Primary Goals And ObjectivesThe primary goal of a maintenance information system should be to aid the maintenance department in providing the required equipment or plant availability at the lowest possible cost. To achieve this
Jan 1, 1979
-
High Resolution Helicopter Em-Mag Survey Of The Ortiz Mountains, Santa Fe County, New MexicoBy Craig J. Nelsen, David A. Smith
In 1987, LAC Minerals (USA), Inc. conducted a high resolution helicopter electromagnetic (EM) and magnetic geophysical survey on the Ortiz Mine Grant, New Mexico. The primary purpose of this survey wa
Jan 1, 1989
-
Fuzzy logic controller: Application to liquid-level systemBy K. Rajamani, I. Shah
The development of liquid-level control algorithms, based on sets of linguistic rules expressing human operator's "intuitive" control strategies, have been reported. The main objective of the pre
Jan 1, 1987
-
The Role of Nonpolar Oils as Flotation ReagentsBy S. K. Kawatra, R. A. Seitz
Nonpolar hydrocarbon oils are commonly used in the flotation of minerals to fulfill a number of roles. These roles include reducing overall reagent costs by replacing part of the collector addition, i
Jan 1, 1986
-
Precipitation By Metals - TheoryBy Fathi Habashi
Precipitation of a metal from an aqueous solution of its salts by another metal is known as cementation, because the precipitated metal is usually cemented on the added metal. This phenomena was once
Jan 1, 1970
-
A Numerical Simulation Of The Effects Of Swelling On Concrete Settlement Tanks Founded On Swelling ClayBy Ch. Arvanitidis
This paper presents the design solution for an actual case of settlement tanks, for a wastewater treatment plant under construction, actually founded on swelling clay (the nature of which had not been
Jan 1, 2005
-
Dynatec International Limited Long Round DevelopmentBy W. M. Shaver, W. R. Dengler
INTRODUCTION In Canada, most of the rock being broken in underground metal mines is being carried out using traditional drilling and blasting methods. Despite advances being made in hard rock borin
Jan 1, 1993
-
An Investigation Of Stand-Up Time Of Tunnels In Squeezing GroundBy Gregg E. Korbin, Robin B. Dill, Corey T. Dare, Tor L. Brekke, Larry R. Myer
A study was conducted to develop a fundamental understanding of the relationship between the size of an advancing tunnel face, the rate of excavation, and stand-up time in squeezing ground. Stand-up t
Jan 1, 1981
-
MISIMA - Misima Bulk Low Grade Gold-Silver Deposit, Papua New Guinea ? Introduction ? LocationBy Dick Lewis
The Misima deposit is on Misima Island in the Lousaide Archipelago, 240 km east-southeast of the Papua New Guinea mainland, and 600 km east of Port Morseby. Misima is a narrow mountainous island 40 k
Jan 1, 1990
-
A Computer Solution To The Queuing Problem At A Mine-Mill Interface ? IntroductionBy Y. L. Su
This paper describes a case study where solutions were sought to the truck queuing that occurred at a central processing plant. Ore from three production shafts at Falconbridge Limited's Sudbu
Jan 1, 1986