Mill Expansions at PT Freeport Indonesia

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 910 KB
- Publication Date:
- Jan 1, 1994
Abstract
Production at Freeport Indonesia's Ertsberg open pit copper-gold mine started in 1972 at a rate of 7.5 kt/d (8270 stpd). Mill throughput remained at that rate for several years until the discovery of the Ertsberg East (GBT) ore body. This discovery prompted three succes¬sive expansion stages from 1981 to 1988 that boosted production to 20 kt/d (22,000 stpd). In 1988, the discovery of the huge Grasberg porphyry copper deposit launched an era of much larger expansions. The first of these was the installation of a fourth primary mill in 1989 that increased throughput to 32 kt/d (35,270 stpd). That was followed by an expansion of the crushing and screening plant and in 1991 the addition of a new south concentrator to bring production to 57 kt/d (62,830 stpd). The addition of a primary ball mill and the changeout of the original Denver flotation cells in 1993 brought production to its current level of 66 kt/d (72,750 stpd).
Citation
APA:
(1994) Mill Expansions at PT Freeport IndonesiaMLA: Mill Expansions at PT Freeport Indonesia. Society for Mining, Metallurgy & Exploration, 1994.