    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • SME
    New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling

    By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen

    Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes

    Jan 1, 2007

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • SME
    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007

  • SME
    Lithium: A Review of 1999 Activities

    By M. Tamlin

    The state of the lithium mineral industry is closely linked to the performance of the glass and ceramic industries and to the overall economy. Demand for the glass/ceramic products in Europe, Asia and

    Jan 1, 2000

  • SME
    Development Of New Geophysical Technique For Mineral Exploration And Mineral Discrimination Based On Electromagnetic Methods

    By Michael S. Zhdanov

    One of the major problems of mineral exploration is the ability to reliably distinguish between uneconomic mineral deposits and economic mineralization. While the mining industry uses many geophysical

    Jan 1, 2005

  • SME
    A Dissolution Kinetic Model For Metal Powders A Case Of Varying Surface Area

    By Kenneth N. Han, Peter Nam-soo Kim

    A kinetic model for leaching of particulate metals in a batch system has been developed. The leaching mechanism has been analyzed by solving a series of ordinary differential equations relating hetero

    Jan 1, 2005

  • SME
    NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

    By Steve Klein

    The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austria

    Jan 1, 2008

  • SME
    Rock Mass Characterization for the WSSC Bi-County Water Tunnel

    By Paul Headland

    The Washington Suburban Sanitary Commission (WSSC) has recently completed design for the Bi-County Water Tunnel Project. The project will include a 10-foot diameter, 5.3-mile long hard rock tunnel loc

    Jan 1, 2008

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SME
    Fire Safety Design for the New South Ferry Terminal Project in the New York City Subway

    By J. Greg Sanchez

    The New South Ferry Terminal in the New York City Transit system represents an important milestone for the city. This is the first station designed and built in the 21st century. The design of the fir

    Jan 1, 2008

  • SME
    Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International Airport

    By Mohammad Djavid

    The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo

    Jan 1, 2008

  • SME
    Phased Approach to Stormwater Tunnel Rehabilitation

    By Todd Wanless

    This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel

    Jan 1, 2008

  • SME
    Application of MULTIFLUX for air, heat and moisture flow simulations

    By G. Danko

    MULTIFLUX, a new thermal, hydrologic, and airflow model and software is being developed to solve the flow of heat, moisture, and air in and around an underground opening. MULTIFLUX couples two distinc

    Jan 1, 2009

  • SME
    Water Tunnel Beneath New York Harbor

    By Mohammad R. Jafari

    The Camp Dresser & McKee (CDM)/Hatch Mott MacDonald (HMM) joint venture has been engaged by the New York City Economic Development Corporation (NYCEDC) to provide engineering ser-vices in connection w

    Jan 1, 2008

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007