Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recent Developments in North America in the Design of Precast Concrete Tunnel Linings ? IntroductionBy Brian Garrod
Increasing use of pressurized-face tunnel boring machines in North America has produced a similar increase in the application of precast concrete tunnel linings. Where a pressurized TBM is needed, imm
Jan 1, 2008
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
Exploration Review (0aa637d4-de3b-49fc-9275-003815a21e5a)By D. R. Wilburn
This summary of international mineral exploration activities for 2008 draws upon available information from industry sources, published literature and U.S. Geological Survey (USGS) specialists. The s
Jan 1, 2009
-
Octyl Diphosphonic Acid As Collector For Niobite FlotationBy Daniel Tao, Jike Qiao, Hao Ren, Feifei Ji, Gonglun Chen
The floatation of niobite was studied using a number of collectors at various dosages and solution pH’s. Octyl diphosphonic acid was found to be an effective collector for niobite flotation with good
Jan 1, 2005
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension ProjectBy David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice
INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif
Jan 1, 2007
-
Use of baseline personal DPM exposure data for mine ventilation planning- A South African JourneyBy B. K. Belle
The use of diesel engine locomotives in South African mines can be traced to Van Dyk Consolidated Mines Ltd on the Witwatersrand gold mines in 1928 as a replacement for battery locomotives. The advant
Jan 1, 2009
-
The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling AspectsBy V. Gall, J. Rudolf
The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail
Jan 1, 2007
-
Effectiveness of a water curtain utilized for dust control on continuous miner sectionsThe Mine Safety and Health Administration (MSHA) conducted a respirable dust survey to evaluate the effectiveness of a water curtain utilized for dust control on continuous miner sections. The purpose
Jan 1, 2009
-
Beach Sewer Tunnel Rehabilitation ? IntroductionBy Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008
-
EPB Tunneling in CanadaBy Laura McNally
In 2006 McNally International Inc. in a Joint Venture partnership with Aecon Constructors was the successful bidder on two York Region Tunnel Projects: Bathurst Collector/Langstaff Trunk Sewers; and Y
Jan 1, 2008
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
Rehabilitation of a Brick-Lined AqueductBy Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick
BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006
Jan 1, 2007
-
Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access ProjectBy Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis
East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta
Jan 1, 2007
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Water Tunnel in Liaoning Province, Northeast ChinaBy Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring
The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra
Jan 1, 2007
-
Creative distribution techniques can help market penetration of industrial mineralsBy Mark P. Juzli
During the 1980s, a revolution has been taking place in industrial minerals marketing. Transportation deregulation and a handful of creative marketing and distribution managers have completely changed
Jan 1, 1989
-
Development Of High-Efficiency Hydraulic SeparatorsBy Karen Mikkola, Gerald Luttrell, Jaisen Kohmuench, Glen Oswald, Michael Mankosa, Tracy Westerfield
Hydraulic separators are commonly used for particle size classification and gravity concentration of minerals and coal. Unfortunately, the efficiency of these processes can be quite low due to poor eq
Jan 1, 2005
-
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, ColombiaBy Ludger Suarez-Burgoa
At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod
Jan 1, 2008
-
A 4.75m Contractor Manufactured EPB MachineBy Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008