Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effect of Frother Type on Foam Structure

    By Gonzalo Díaz, Diego Mesa, Willy Kracht

    "It is well known that frothers affect the amount of water that is transferred to the froth, which has an effect on both the froth stability and the water recovery. On the other hand, since non-select

    Jan 1, 2016

  • CIM
    Heat Flow and Permafrost

    By Alan M. Jessop

    This paper discusses the distribution of frozen ground in the zone of discontinuous permafrost in relation to the pattern of surface temperature. The importance of understanding permafrost in relation

    Jan 1, 1972

  • CIM
    Effect of Heat Treatment on Linear Friction Welded TI-5553

    By E. Dalgaard

    During linear friction welding of titanium alloy Ti-5A1-5V-5Mo-3Cr (Ti-5553), the weld zone exhibits beta (B) grain refinement and alpha (a) phase depletion that have the combined effect of deteriorat

    Jan 1, 2011

  • CIM
    Predicting and Preventing Spreading of Fines in Submarine Tailings Disposal

    By E. Larsen

    Marine tailings disposal may in some cases be the best solution to one of mining’s major environmental problems. The public standing of this solution is poor, partly because of past bad practices. Amo

    Jan 1, 2016

  • CIM
    Observational Construction Management of a Large Scale Underground Railway Station by Urban NATM Based on the Mechanism for Generation of Surface Settlement -Railway Bosphorus Tube Crossing, Tunnels and Stations

    By S. Kobayashi, N. Ohara, T. Aoki, S. Sakurai, M. Iwano, M. Shimo, I. Otsuka

    "This project is the upgrading of a commuter line of approximately 76 km to improve the railway system in Istanbul metropolitan area. Railway tracks have been connected between Asia and Europe through

    Jan 1, 2015

  • CIM
    Underground Mining at Alwinsal Potash

    By A. H. Duffield

    "Forming part of the Prairie Evaporites, the sylvinite layer mined at Alwinsal underlies the Blairmore quicksands and the water-bearing Devonian formations. Production is achieved by a method of track

    Jan 1, 1972

  • CIM
    The Bronzes': A Study of the Changes in the Solid Alloys from 0-38.5 per cent Sn

    By O. A. Carson

    Introduction Although the equilibrium conditions of the copper-tin alloys have been the subject of a ?great amount of research, the equilibrium diagram is still in doubt. The first systematic in

    Jan 1, 1929

  • CIM
    The Mechanism of Chalcopyrite Leaching in Acidic Ferric/Ferrous Sulfate Media in the Presence of Silver-Enhanced Pyrite

    By D. B. Dreisinger, D. G. Dixon, G. Nazari

    "The kinetics of chalcopyrite leaching in acidic ferric/ferrous sulfate media under atmospheric conditions in the presence of pyrite has been investigated. It has been found that pyrite samples from d

    Jan 1, 2012

  • CIM
    Removal of Copper and Zinc from a Cobalt Electrolyte by Ion Exchange at Kamoto Copper Company’s Luilu Plant

    By E. Hardwick, K. C. Sole, Y. Jurrius

    "The Luilu cobalt plant at Kolwezi, Democratic Republic of Congo, has been operating since the late 1950s, using a conventional precipitation flowsheet for removal of impurities from the cobalt proces

    Jan 1, 2014

  • CIM
    Corrosion properties of skin and bulk of semi-solid processed and high pressure die cast AZ91 alloy

    By C. Blawert

    The corrosion properties of the skin and the bulk of semi-solid processed and high pressure die cast AZ91 alloy were studied in 5% NaCI solution by (a) analysing the corrosion morphology, (b) measurin

    Jan 1, 2004

  • CIM
    Implementation of Air Liquide Shrouded Injector (ALSI) Technology at the Thai Copper Industries Smelter

    By N. Wachgama, J. P. T. Kapusta, R. U. Pagador

    The Thai Copper Industries smelter (Thai Copper) is located some 200 km southeast of Bangkok near the MapTaPhut deep sea port in one of the industrial centres of Thailand. Although construction of the

    Jan 1, 2007

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency

    By Robert E. McIvor

    "The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci

    Jan 1, 2009

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Study of Gold Leaching with Bromine and Bromide and the Influence of Sulphide Minerals on this Reaction

    By Mani Manimaran, Inna Dymov, Mariam Melashvili, Chris Fleming, Joe O’Day

    This paper presents experimental evidence that supports the use of bromine/bromide as a potential alternative to conventional cyanidation for gold leaching. The study evaluated a brominebased lixivian

    Jan 1, 2014

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Unnamed Platinum-Group Minerals

    "9.1. IntroductionThe application of the electron microprobe for in-situ analysis of platinum-group minerals (PGM), first reported by Borovskii et at. (1959) and Genkin (1959), has resulted in a large

    Jan 1, 1979

  • CIM
    Symposium on Tailings Revegetation

    By E. Watkins, J. C. LeRoy, A. Vivyurka

    "TAILINGS REVEGETATIONWelcome to the Revegetation Session. My instructions are to introduce the Speakers and to provide a general introduction.I do the latter with humility not only because of a lack

    Jan 1, 1975

  • CIM
    Geostatistical Modeling of Particle Size Distributions in The McMurray Formation

    By O. Babak, J. G. Manchuk

    ABSTRACT A significant factor in evaluating bitumen recovery from an oil sands mine is the particle size distribution (PSD). Increased understanding of mined ore quality and improvement in predictions

    Jan 1, 2013