Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Impact of Frother on Bubble Production and Behaviour in the Pulp Zone

    By C. Acuña

    The case is presented that the key role of frother is control of bubble size in the pulp zone. Compared to water alone, the addition of frother produces a narrower distribution and finer bubble size.

    Jan 1, 2007

  • CIM
    Development of a Low-Carbon Calcium Aluminosilicate Binder for Gold Mine Tailings Backfill.

    By Farzaneh Abedini, Narain Hariharan, Lucas C. McFarlane, Nikolas A. Romaniuk, Tiffany Thayne

    The use of dewatered mine tailings as backfill material (commonly referred to as ‘paste’ backfill), is the most practiced form of backfill in Canada providing significant environmental benefits by red

    May 4, 2025

  • CIM
    Western Canada and Canadian Energy

    By N. H. Grace

    "IntroductionDURING the past half century, the economy of Western Canada was largely centred on agriculture. However, the impact of World War II has led to an acceleration in the development of a vari

    Jan 1, 1953

  • CIM
    Fine particles removal from oil sand tailings by hydrocyclone

    By R. Burns, A. I. A. Salama, M. W. Mikhail

    "Large amounts of oil sand tailings are produced in the Fort McMurray area, including sand, clays, and misplaced bitumen. The objective of the present study (as part of the overall engineered tailings

    Jan 1, 1997

  • CIM
    INAC: Supporting Involvement of Aboriginal People in the Economy

    By Jr. Arcand

    Canadian Economy ? Getting Results ???? A stronger Canadian economy ???? National debt cut ???? Taxes reduced, tax-free savings account, support for manufacturing sector ???? Assisting with inf

    May 1, 2008

  • CIM
    A Contribution to Chloride Hydrometallurgy: Regeneration of Superazeotropic Strength HCL via Reactive Crystallization

    By T. Feldmann, G. P. Demopoulos

    The feasibility of chloride leaching processes depends on interfacing them with cost-effective HCl regeneration technologies. This paper summarizes the most important findings of research conducted in

    Jan 1, 2014

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    Real Behaviour Of Thickened Tailings

    By C. Cano

    One of the main concerns within the mining industry is to minimize the impact of tailing facilities to the environment and nearby communities. Since the implementation of the first thickened tailings

    Jan 1, 2007

  • CIM
    Laboratory Flotation of Voisey's Bay Ovoid Zone Massive Sulphide

    By P. Lostritto, G. E. Agar, G. Labonte, M. Cherevaty

    "A locked cycle flotation test was done on a sample from the ovoid portion of the Voisey 's Bay copper-nickel sulphide ore. The chemical conditions for this test were generated by prior independent te

    Jan 1, 1998

  • CIM
    Nstrumentation and Monitoring Techniques for Oxygen Barrier Covers Used to Control Acid Mine Drainage

    By Abdelkabir Maqsoud

    Different management options and rehabilitation strategies are available for mine wastes that produce acid mine drainage (AMD). One of them consists in building a cover with capillary barrier effects

    May 1, 2007

  • CIM
    Surface damage and phase fragmentation in Al-Si alloys during single pass scratch tests

    The fracture behavior of second phase particles and the role of matrix material on the wear resistances of the three Al-Si alloys containing 8, 17, and 19% Si were investigated using single pass scrat

    Jan 1, 2005

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • CIM
    Texture Randomization during Thermomechancial Processing of a Magnesium-Yttrium-Neodymium Alloy

    By J. W. Senn

    A magnesium alloy modeled after commercial alloy WE54 was thermomechanically processed and characterized to understand the mechanisms by which its texture can be randomized, as reported by Ball and Pr

    Jan 1, 2006

  • CIM
    Potentiel du forage à I'aide des foreuses hydrauliques sur béquille - Contexte Canadien

    By Jacek Paraszczak, Stefan Planeta

    "RésuméDans la première partie de cet article on discute Ie contexte technico-économique de l'usage des foreuses à l'eau sur béquille dans des mines sud-africaines. Par la suite on présente

    Jan 1, 1995

  • CIM
    Effect of Fe on the Evolution of Microstructure and Elevated Temperature Properties in Al-Mn-Mg 3004 Alloys

    By X. -G. Chen, K. Liu

    Nowadays, great interests are rising on aluminum alloys for the applications at elevated temperature, driven by the automotive and aerospace industries requiring high strength, light weight and low co

    Jan 1, 2015

  • CIM
    The First Electrolytic Copper Refinery in Australia at Wallaroo, South Australia

    By B. McHenry, A. E. Wraith, P. J. Mackey

    The Wallaroo smelter on the Yorke Peninsula, South Australia commenced smelting operations in 1861 treating ores from the nearby Moonta and Kadina mines. The plant expanded and modernized on several o

    Jan 1, 2019

  • CIM
    The Box Mine

    By W. G. Jewitt

    THE Box mine, situated in Saskatchewan on the north shore of lake Athabasca, is unique in two respects. It is the first and, so far, the only gold mine in Saskatchewan, and it is the only gold mine in

    Jan 1, 1940

  • CIM
    Some Features of the New A. C. Locomotive for Craigmont Mines

    By Smortchevskyk N. J.

    THIS paper describes the electrical features of the locomotive now (August, 1962) under construction for Craigmont Mines. Intended for non-specialists, it avoids details of design and calculations int

    Jan 1, 1963

  • CIM
    Twelve Months' Milling at Noranda

    By C. G. McLaughlan

    The Noranda concentrator was placed in operation in October, 1928, and the object of this paper is to outline operations during the twelve months which have elapsed since that time. The ores milled

    Jan 1, 1930

  • CIM
    Quality Assurance Programs for Fabrication of Specialised Vessels and Exotic Alloy Piping

    By M. Pearson, W. Bristowe, A. Hanson

    "There's no such thing as quality assurance; only quality control ... by inspection. "(1) A common misunderstanding in the procurement and construction of custom designed, fabricated pressure ves

    Jan 1, 2004