Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    The Advance And Relieve Mining Method: A Horizontal Stress Control Technique

    By Frank E. Chase

    Sacrificial entries, roof slotting, and other tactics have been used to combat high horizontal stresses during roadway development in U.S. coal mines. In Australia, the "pillar extraction on the advan

    Jan 1, 1999

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    Downhole Overcoring Stress Measurement at a Western Underground Coal Mine

    By David Conover

    Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal

    Jan 1, 2004

  • SME-ICGCM
    Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)

    By Gabriel Esterhuizen

    The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability

    Jan 1, 2004

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design

    By Kot Unrug

    For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the

    Jan 1, 2003

  • SME-ICGCM
    Design Factors In Near-Seam Interaction

    By A. Grenoble

    The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr

    Jan 1, 1984

  • SME-ICGCM
    Root Causes of Groundfall Related Incidents in U.S. Mining Industry (2ced207f-73e6-4ab3-8c4e-7a683f4eb75c)

    By Kousick Biswas

    The main objective of occupational health and safety research is to minimize or eliminate the events that may cause fatal or non¬fatal injuries to human workers. A commonly used technique is to devise

    Jan 1, 2003

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Practical Stress Modeling for Mine Planning

    By Keith Heasley

    As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines

    Jan 1, 1998

  • SME-ICGCM
    Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)

    By P. A. Gray

    Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c

    Jan 1, 1992

  • SME-ICGCM
    Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal Seam

    By Bingjie Huo

    "China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup

    Jan 1, 2010

  • SME-ICGCM
    Three Dimensional Modeling of a Surface Displacements As a Result of an Underground Longwall Panel Extraction

    By Anton Sroka, Antoni Tajdus, Axel Preusse, Krzysztof Tajdus

    "In Europe, the magnitude and range of mining deformation predicted on the surface have been, in most cases, determined using methods based on Gauss' influence function (e.g., Knothe's theory, Ruhrkoh

    Jan 1, 2010

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    A Case Study of Topography?Related Stress Rotation Effects on Multi?seam Stability

    By Ihsan Berk Tulu

    The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi

    Jan 1, 2014

  • SME-ICGCM
    Merging Coal Mine Geologic Hazard Mapping with Mine Production Rates—Industry Experience

    By Kevin Andrews, Scott Nelson, Terry Hamrick

    "In the process of Geologic Hazard Mapping (GHM) for underground coal mining, geologists evaluate the effects of various geologic and geotechnical conditions to assist with optimization of mine produc

    Jan 1, 2018