Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Ground Control Hazard Analysis In Multi-Seem Mining

    By R. Fraher

    Hazard analysis utilizes interaction mechanisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using characteriz

    Jan 1, 1992

  • SME-ICGCM
    Deformation Development Around Mine Roadways And Simulation Of Roadway Supports

    By E. Yasar

    This paper describes the use of the sand and plaster physical modelling technique to investigate the deformation around mine roadways using a variety of support methods in a particular form of stress

    Jan 1, 1995

  • SME-ICGCM
    Numerical Simulation on Microseismicity Due to Mining at One of the Collieries in Australia

    Numerical simulation for microseismicity due to mining at one of the collieries in Australia was carried out and the results were compared to the observed microscismicity. 3-D Stress analysis showe

    Jan 1, 2001

  • SME-ICGCM
    Investigating the Contributing Factors to Rib Fatalities Through Historical Analysis

    By Tristan H. Jones

    Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m

    Jan 1, 2014

  • SME-ICGCM
    Roof Falls And Caving In Longwall Mining Operations

    By Kot F. Unrug

    Since the introduction of longwall systems, the prediction of roof behavior and support requirements have become the major issue referring directly to safety as well as productivity. In more recen

    Jan 1, 1982

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • SME-ICGCM
    Classification Of Mine-Related Subsidence East Of Mississippi River, U.S.A.

    By Jesse L. Craft

    Field investigation of surface subsidence events associated with both active and abandoned underground coal mines in the United States has established criteria that enable the prediction and classific

    Jan 1, 1992

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock Mass

    By Andrew J. Hyett

    The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not

    Jan 1, 1989

  • SME-ICGCM
    A Method to Determine the Corrosion Potential of Rock Bolts on Coal Mines

    By Kanchan Mondal, Anthony (Sam) Spearing, Gopi Bylapudi, Joseph C. Hirschi

    "The U.S. coal mining industry uses about 100 million rock anchors per year. ASTM F432 specifies the requirements for rock bolts on mines but does not address corrosion. Corrosion has been found to be

    Jan 1, 2010

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Evaluation of Potential Impacts to Stream and Ground Water Due to Underground Coal Mining

    By Jimenez Leon, Christopher Newman, Boede Gabriel, Zacharias Agioutantis

    "Ground movements due to longwall mining operations have the potential to damage the hydrological balance within as well as outside the mine permit area in the form of increased surface ponding and ch

    Jan 1, 2016

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    Determination Of The Rock Strength From Portable Rock Tester

    By K. F. Unrug

    A new testing technique for the determination of the rock strength from portable rock tester is proposed. It is a quick and economical method that can determine the rock strength with reasonable accur

    Jan 1, 1990

  • SME-ICGCM
    Failure Characteristics Of Roof Falls At An Underground Stone Mine In Southwestern Pennsylvania (75950903-1172-4003-a90c-706052b9d4ea)

    By Anthony T. Iannachione

    The location and time of 2,007 microseismic emissions from a limestone mine in southwestern Pennsylvania were compared with the development of mine faces and the characteristics of the mine layout. Ba

    Jan 1, 2001

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • SME-ICGCM
    An Examination Of Energy Calculations Applied To Coal Bump Prediction

    By Keith A. Heasley

    Pillar recovery in deep coal mines with competent roof and floor can concentrate stresses and generate hazardous bumps. Actual calculation of the geologic strain energy released in association with th

    Jan 1, 1990

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    Determining Horizontal Stress Direction Using The Stress Mapping Technique

    By T. P. Mucho

    Mine roof failure due to excessive horizontal stress has been recognized as a major cause of hazardous roof conditions in some mines. Stress measurements gathered by the U.S. Bureau of Mines (USBM) at

    Jan 1, 1994

  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998