Rheology of ore suspensions with fibrous minerals and its impact on flotation performance Mining, Metallurgy and ExplorationBy P. Somasundaran, D. R. Nagaraj, Tarun Bhambani, P. Patra
Flotation separation and recovery of value minerals from ores containing fibrous silicate minerals are known to be quite challenging. Earlier studies have established that the metallurgical challenges
-
Boart Longyear Coring Bits Pass Field TestsUsing mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A
Jan 1, 2009
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Practical Tunnel Lining Design Methodology and Guidelines—A Series of Tunnel Design PapersBy Bradford F. Townsend, Colin R. Speers
INTRODUCTION This is the first in a series of papers addressing practical tunnel lining design. The format for this and future papers is to present a particular topic and support the presentation o
Jan 1, 2005
-
Connection of TARP Tunnel to Thornton Quarry ReservoirBy Djavid Mohammad
Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad
Jan 1, 2008
-
Multi Mineral Cutoff Grade Optimization With Option To StockpileThe Cutoff grade optimization is very critical to the open pit production scheduling. In case of single mineral deposits, algorithms have been developed for determining cutoff grade policy that maximi
Jan 1, 1997
-
Improving Storage And Handling Of Ores In Mining And Processing OperationsBy Jayant Khambekar
In a typical mining operation, run-of-mine (ROM) ore is crushed and screened to achieve a desired particle size distribution and then fed to processing equipment for further refining. For an operatio
Jan 1, 2009
-
Characteristics Of Chimney Subsidence Sinkhole Development From Abandoned Underground Coal Mines Along The Colorado Front RangeBy Gordon M. Matheson
The factors which control chimney subsidence sinkhole development in weak rock were assessed by analyzing the characteristics of approximately 3000 chimney subsidence features along the Colorado Front
Jan 1, 1986
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
Geochemical Profiling Of A Sulfide Leaching Operation: A Case StudyBy S. M. Flaherty, R. E. Scheffel, A. Guzman
Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me
Jan 1, 2006
-
Building Better Haul Roads: Designing For Structural StrengthThe structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo
Jan 1, 2011
-
Boddington Gold Mine Moves Closer To ProductionConstruction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr
Jan 1, 2009
-
Building the East-West Cross Drift Tunnel at Yucca MountainBy Brian Fulcher
In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an
Jan 1, 2000
-
Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, CaliforniaBy David Young
This paper presents tunnel design considerations for the SR75/282 Transportation Corridor Project in Coronado, California. The project is managed by the City of Coronado in cooperation with Caltrans a
Jan 1, 2008
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Tunnel Protection by Ground Improvement Prior to Track LoweringBy Ronald E. Triplett, George K. Burke, Bernard H. Voor
To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which
Jan 1, 2001
-
Strong dollar and imports steal momentum from US mining recoveryBy J. D. Morgan
Demand for nonfuel minerals depends on the overall state of the economy, which steadily improved each quarter in 1984. New housing starts rose to 1.8 million units. Automakers turned out about 15% mor
Jan 5, 1985
-
Current usage of continuous monitoring systems in coal mines discussedBy Kevin G. Stricklin
Introduction Continuous monitoring techniques have been used in the US and abroad for many years. A continuous miner has a monitor that measures methane and automatically gives a warning if the metha
Jan 9, 1987
-
The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension MeasurementsBy B. Comley, M. C. Harris
There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf
Jan 1, 2001
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005