Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Winning thin coal seams with Stratablast™- improving coal recovery and sustainability at Anglo Coal’s Drayton Mine

    By Matthew Graham, Tapan Goswami, Geoff Brent

    In dragline coal mining operations, throw blasting is used for the controlled placement of overburden to maximise coal exposure rates or to minimise overburden removal costs. This may necessitate sacr

    Jan 1, 2010

  • ISEE
    Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill & Blast Engineering Focused Projects

    By Manuel Villalobos Calderón

    This paper presents the Enaex group approach to addressing the blasting challenges and outlines the solutions created. Aspects such as rock mass damage occurrence as a function of blast vibration freq

    Feb 1, 2020

  • ISEE
    Application of Strict Liabilty and Negligence to Blasting Claims

    By Timothy D. Stark

    Blasters are usually strictly liable for injury or damage caused by flyrock (trespassory invasion) and blast-induced vibrations (non-trespassory invasion). The application of strict liability to non-t

    Jan 1, 2004

  • ISEE
    Destress Mass Blast in the North Regional Pillar at Brunswick Mine

    By Philemon Desrochers, Ken Qian Liu

    Following the success of the West Ore Zone distress mass blast in 2001 at Brunswick Mine, a similar approach was taken to distress the North Regional Pillar (NRP) which contained over 3 million tonnes

    Jan 1, 2004

  • ISEE
    Effects of Mid-Field Surface Blasts on a Tall Scaled Target

    By Ethan Steward, Kyle Perry

    Blast resistant structural design continues to be a research area of major concern for governments around the world due to explosive threats from both state and non-state actors. Glass and aluminum cu

    Jan 21, 2025

  • ISEE
    Journal: 100 Years / DU PONT BLASTING POWDER 1913

    By Robert Hopler

    In use, blasting powder is exploded by a spark from fuse, electric squib or miner’s squib, or by a primer of some high explosive, the last being employed only in heavy charges on open work. In mining,

    Jan 1, 2014

  • ISEE
    Emulsion Breakers for Waste Explosives

    By Maja Franjic, Ian Tolliday, Chris Collins, James Wiltshire

    Ammonium Nitrate Emulsions (ANE) are a large segment of the explosives market for the mining industry. These emulsions are generally designed to be very stable but when breakdown does occur, removal o

    Jan 21, 2025

  • ISEE
    Management's Effect on Drilling and Blasting

    By Alan R. Gadberry

    To resolve drilling and blasting problems, rather than treating symptoms and allowing problems to grow, the mine operator needs to change the way he operates. When a mine operator discovers a drilling

    Jan 1, 1985

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    A Modern Look at the Origins of Intra-plant Distance Tables

    By Lon Santis

    In 1923, Ralph Assheton compiled a report for the Institute of Makers of Explosives (IME) on accidental explosions in manufacturing plants. The report chronicles the type and amount of explosive invol

    Jan 1, 2010

  • ISEE
    Development of Splitting Technology by Using Electric Discharge Impulse Crushing System

    By Hideaki Kitajima, Ryo Sakamoto, Katsuya Sasaki, Maehata Hidehiko

    The Electric Discharge Impulse Crushing System (EDICS) is a technology for carrying out crushing by using electrical power and nitromethane. It is designed for construction tasks such as splitting of

    Jan 1, 2011

  • ISEE
    Precision Presplitting: Explosive Load Variations with Spacing

    By Calvin Konya, Anthony Konya

    Presplitting is a form of blasting that when executed properly will create a smooth wall that will minimize secondary conditioning. In recent years, presplitting has become a popular technique to be u

    Jan 1, 2017

  • ISEE
    Journal: Safety Talk / Crisis Management

    By William Reisz

    The explosives and blasting industry has a commendable safety and security record, especially over the last several decades. This is due in large part to our newer technologies, better training and ed

    Jan 1, 2012

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates

    Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a

    Feb 1, 2020

  • ISEE
    New Safety Fuse using NO3Na+C+S as its Formulation

    By Jesús V. Saccsa, Kenji B. Loayza, Erick M. Condori, Jorge A. Velásquez

    This research investigates how to reduce manufacturing costs of a safety fuse composed of black powder, replacing its ingredient NO3K by NO3Na for processing, and contributing to minimize costs per bl

    Jan 1, 2017

  • ISEE
    Optimization of Equipment Exclusion Zones in Mining Blasting Processes Through Predictive Analysis and Field Validation

    By Orica Peru, Pedro Lozada

    Proper management of exclusion zones in blasting operations is essential to ensure safety without compromising operational efficiency. In Peru, mining regulations establish minimum exclusion distances

    Jan 26, 2026

  • ISEE
    Blasting Seismographs: Transfer Functions, Standards and Accuracy

    "In this work a blasting seismograph was tested on a vibration shaker controlled by a single-point laser Doppler vibrometer (LDV). A total of 43 tests were made to measure the transfer properties(tran

    Jan 1, 2017

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Evaluation of Advanced Bulk Emulsion Explosive and Loading System

    By Lawrence Mirabelli, AngloGold Ashanti, Greg Gibson

    Cripple Creek & Victor Gold Mining Company (CC&V) operates the largest surface gold mine operation in Colorado and is located west of Colorado Springs in Teller County between the towns of Cripple Cre

    Jan 1, 2014

  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017