Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' OperationBy Michel Bustamante
The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w
Jan 1, 2002
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Introducing VCE's: Support Of Excavation Without Tie-BacksBy Rick Deschamps
A reoccurring problem with support of excavations in urban areas involves the placement of external support components like anchors or nails in right-a-ways, subway and utility setbacks, in areas occu
Jan 1, 2008
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury
"The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb
Jan 1, 2016
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term ExposureBy D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
The Use of Rigid Inclusions to Support Large SpansBy Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic
Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr
Jan 1, 2019
-
Seismic Behavior of Full-Scale Piles in Improved Soft Clay (8135d170-323f-4789-8067-7d5f00fd5bb8)By Jin-Wei Huang, Bradley J. Fleming, Sri Sritharan
"Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundamen
Jan 1, 2017
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
The Use of DSM Columns to Control Heavy Haul Railway Embankment StabilityBy Kim Chan, Bryn Thomas, Ben Dening
"Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra
Jan 1, 2015
-
Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages