Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, IdahoBy Dean E. Harris
The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of
Jan 1, 2003
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? SynopsisBy H. Meseck
Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr
Jan 1, 2010
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? SynopsisBy Y. G. Li
The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c
Jan 1, 2010
-
Ladies And Gentlemen,By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Load Transfer Curve of Piles in Sands under Uplift ForcesBy Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour
The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so
Jan 1, 2018
-
Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom SealBy Carole L. B. Mitchell
The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The
Jan 1, 2004
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile GroupsBy Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018
-
Practical Soil Nail Wall Design And Constructability IssuesBy Walter G. Kutschke
Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us
Jan 1, 2007
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining StructuresBy Barry C. Slocombe
The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in
Jan 1, 2008
-
Helical Foundations And Tiebacks: Quality Control, Inspection And Performance MonitoringBy John S. Pack
The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m
Jan 1, 2003
-
Determination Of Pile Damage In Concrete PilesBy Gerald E. H. Verbeek
As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)
Jan 1, 2011
-
Anchored Hollow Bar Tangent Pile System For UnderpinningBy Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin
This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a
Oct 1, 2022
-
Seismic and Lateral Load Design and Testing GuidelinesBy Don Deardorff, Ke Yang, Yingcai Han, Ken Sorensen, Robert Kruger, Mark Petersen, Diane Fiorelli, Larry Goldfarb, Kathryn Petek, Kwabena Ofori-Awuah
Design of deep foundations for lateral loads requires an understanding of soil-foundation-structure response during loading. Lateral loads on a deep foundation (piles) could be due to earthquakes, win
Jan 1, 2012
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Determination Of Pile Lengths Under Existing StructuresBy Mohamad Hussein
Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b
Jan 1, 1992
-
Dynamic Load Testing of Drilled Deep FoundationsBy Paikowsky, Samuel G.
"Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically
Jan 1, 2015