Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Water Power in British Columbia

    By Ernest Davis

    WATER power, until developed, produces nothing, but when harnessed it continues to produce, it might be said, indefinitely. Hence the importance of developing all feasible water powers. British Colu

    Jan 1, 1942

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Recent Trends in Autogenous Grinding

    By Bunting S. Crocker

    This paper reviews the trends in the past two years in autogenous grinding throughout the world. It covers rock grinding in South Africa, Sweden, Canada, the United States, Finland and Germany. To pro

    Jan 1, 1963

  • CIM
    Pilot Plant Investigations on Cold Water of Bitumen from Alberta Bituminous Separation Sands

    By L. E. Djingheuzian

    Introduction For many years the immense deposits of bituminous sands of northern Alberta have been attracting the attention of our governments, engineers and .scientists ( 6). Undoubtedly these bitum

    Jan 1, 1952

  • CIM
    An Investigation on Processing Characteristics of Gold Ore Samples from Barry Deposit, Quebec

    By S. Kelebek, E. Yalcin

    "Two composite samples of a gold-bearing ore from North Western Quebec (Barry Township) were tested to assess their grindability, recovery by flotation and Knelson concentrator as well as extraction u

    Jan 1, 2008

  • CIM
    Magnesia Refractories for Steel Furnaces

    By G. M. Carrie

    Introduction The subject of basic refractories is daily becoming of increased importance in metallurgical processes, and there is a constantly growing necessity for the development of better materi

    Jan 1, 1927

  • CIM
    Overview of the Great Whale Iron Ore Project( GWIOP )

    By Jean Rosaire

    ?GWIOP Location ?Climate and Physiography ?History ?Geology ?Deposit Types ?Mineralization ?Historical Mineral Resources ?Conclusions and Work Program

    May 1, 2007

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    The real costs of lubrication

    By R. Melley, P. Wissner

    The paper looks at the basic theory of tri-bological wear and the role played by the lubricant and its additives. It presents the argument that the “real cost of lubrication” is not the purchase price

    Jan 1, 1997

  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Distribution Ratios of Platinium Group Metals Between Al2O3-CaO-SiO2 or FeO-CaO-SiO2 Slag Systems and Molten Iron

    By K. Yamaguchi, Sekimoto. H.

    "Platinum Group Metals (PGMs) used as catalyst which reduces toxic substances in emission gas exhausted from an automobile should extensively be recycled because they are rare metals produced only at

    Jan 1, 2014

  • CIM
    The Effect of Different Surface Treatments on the Fatigue Strength of Drill Steel

    By T. W. Wlodek

    In this paper the relative merits of shot peening, induction surface hardening, spiral-rolling, and the combination of these surface treatments, are evaluated on the basis of their capacity to increas

    Jan 1, 1958

  • CIM
    A Review of Gas Dispersion Studies in Flotation Plants

    By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie

    "Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th

    Jan 1, 2015

  • CIM
    The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)

    By P. A. Witt

    "Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry

    Jan 1, 2005

  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Galore Creek Project

    Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag

    May 1, 2006