Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Best-in-class maintenance benchmarks in Chilean open-pit mines

    By P. Oyanader

    "In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively r

    Jan 1, 2005

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • CIM
    Investigating Total Media Wear

    By Peter Radziszewski

    "Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing

    Jan 1, 2001

  • CIM
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate

    By A. Drouin, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • CIM
    The Ore Deposits of Nickel Plate Mountain, Hedley, B.C.

    By Paul Billingsley

    NICKEL Plate mountain coincides closely with that portion of the Hedley mining district which is of economic interest. From it has come almost the entire past production, and the active mines of the p

    Jan 1, 1941

  • CIM
    Multiple Feeder Control

    By André Vien, Pedro Gonzalez, Julio Palomino, Rob Perry

    "In many mineral processing plants ore is reclaimed from a stockpile using multiple feeders. The discharge from these feeders is combined onto a single conveyor from which total tonnage is measured. T

    Jan 1, 2000

  • CIM
    A Review of Long Distance Commuting Mines: Implications for Northern Mining Communities

    By Silvana Costa

    In the last two decades, there have been nearly no new mining towns built in Canada. Governments and mining companies have viewed long distance commuting (LDC), commonly known as fly-in-flyout or fly-

    May 1, 2004

  • CIM
    Goldcorp Inc., Red Lake Mine Design and Commissioning

    By R. Tyreman, G. Ritson

    "The Red Lake Mine is situated in Balmer Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dic

    Jan 1, 2001

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017

  • CIM
    Operation and Improvements at the El Indio Roasting Facility

    By John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson

    "The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot

    Jan 1, 1999

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    On-Line Mine ? A New Concept for Improving Mining Economy Through On-Line Mineral Analysis

    By Ilpo O. Auranen

    Background: Mines of today are moving ever increasing tonnages of rock. The new ore bodies tend be of lower grade and located deeper in the earth?s crust. The industry?s focus to overcome this ?deep

    Oct 1, 2009

  • CIM
    Beneficiation and Extraction of REE from Northern Minerals’ Browns Range Heavy Rare Earth Project

    By T. Hadley, E. Catovic

    "Northern Minerals Limited’s (ASX: NTU) flagship project is the Browns Range Rare Earth Project (the Project) located in Western Australia, consisting of a number of deposits with high value, heavy ra

    Jan 1, 2014

  • CIM
    Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining

    By Simon D. Handelsman

    ?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo

    May 1, 2006

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    Environmental Control Design at Shebandowan Mines

    By T. Peters, W. C. Ferguson

    "Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No

    Jan 1, 1975