Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Perseverance Gold Copper Deposit – A New Peak Mines Challenge

    By B Taylor

    The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent

    Aug 22, 2011

  • AUSIMM
    Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’

    By A Baker

    Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two

    Nov 8, 2011

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    The Ventilation and Refrigeration Design for Australia's Deepest and Hottest Underground Operation ù the Enterprise Mine

    By R Brake

    The Enterprise Mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high-grade copper mine extends from about 1000 m below surface to almost 2000 m below surfac

    Jan 1, 2000

  • AUSIMM
    Mining Truck Operations in Association with Truch-Jig Apparatus

    This paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv

    Jan 1, 1989

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Evaluating the Effects of Non-coaxial Charges for Contour Blasting

    By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt

    Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a

    Aug 24, 2015

  • AUSIMM
    Effective Life-of-mine Planning by Understanding and Managing Risks and Opportunities Associated with Geological Uncertainty

    By M Berry

    Consider these four questions:What is the definition of life-of-mine?When should life-of-mine planning seriously commence?When can life-of-mine planning seriously commence?What is the key input to eff

    Jul 16, 2014

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Preconcentration at Mt Carbine Tungsten Mine using sensor-based ore sorting

    By R Kroukamp, G Rech

    CRONIMET Australia in cooperation with Speciality Metals International, the mining lease holder of the Mt Carbine Tungsten mine, have demonstrated the preconcentration and processing of large (>12 mil

    Nov 10, 2020

  • AUSIMM
    Geochemical Controls on Acid Mine Drainage Generation, Neutralisation Treatment and Attenuation at Iron Duke Mine

    By B Manda, K L. Sandvik, K Musiwa

    Mining and processing of pyrite ore at Iron Duke Mine, north east of Zimbabwe, generates large quantities of acidic mine water as a result of the oxidation of iron sulfides on exposure to air and wate

    Jan 1, 2006

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active Tailings

    By T Baumgartl, D Bradshaw, B Forsyth, M Edraki

    In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals

    Jul 10, 2012

  • AUSIMM
    Drift and Fill - The High Value, High Recovery Mining System

    By M English, M Yumlu

    At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of

    Jan 1, 2008

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    Legacy tailings dam closure with a bituminous geomembrane cover

    By M Medina, J Alexander, R J. Longey

    Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi

    Jul 1, 2021

  • AUSIMM
    Use of Paste for Tailings Disposal

    By J Shillabeer

    Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste technolo

    Jan 1, 1998

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016