Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     The Xiaolangdi Multipurpose Dam Project The Xiaolangdi Multipurpose Dam ProjectBy James A. Nunn Location Xiaolangdi is located in the Henan province of the People’s Republic of China. The distance between Xiaolangdi and the capital of Henan, Zhengzhou, is about200 km. Xiaolangdi is located Jan 1, 1999 
- 
                     Numerical Evaluation and Optimization of Grout Backfill Strategy for a Subsurface Gas Tunnel Numerical Evaluation and Optimization of Grout Backfill Strategy for a Subsurface Gas TunnelBy Davar Abi-Zadeh, Cillian Brown, Deepak Kandra "Grout backfill strategy for a particular subsurface concrete tunnel (~4.9km long, 3.5m in diameter, carrying 20” gas pipeline) was based on achieving 1:100 slope of the fill in order to progressively Jan 1, 2016 
- 
                     Discussion - Shaft Sinking Today– A Boring Business Tomorrow - Technical Papers, MINING ENGINEERINS, Vol 33, No, 12 Dec. 1981, PP. 1705-1710 Discussion - Shaft Sinking Today– A Boring Business Tomorrow - Technical Papers, MINING ENGINEERINS, Vol 33, No, 12 Dec. 1981, PP. 1705-1710By Maurice Grieves GC. Waterman Mr. Grieves' paper on "Shaft Sinking Today--A Boring Business Tomorrow" in the Dec. 1981 issue of MINING ENGINEERING is an excellent description of recent improvements in speed an Jan 3, 1983 
- 
                     Longwall Mining of Trona by Allied Chemical Corp. Longwall Mining of Trona by Allied Chemical Corp.By David Wilson, T. V. Rao INTRODUCTION The Alchem trona mine, owned and operated by Allied Chemical Corp., is located approximately 32 km (20 miles) west of the town of Green River, and 8 km (5 miles) north of Interstate 80 i Jan 1, 1982 
- 
                     Extreme Multiple Seam Mining in the Central Appalachian Coalfields (8129456e-a9ee-4edc-84af-bd34aa808bd3) Extreme Multiple Seam Mining in the Central Appalachian Coalfields (8129456e-a9ee-4edc-84af-bd34aa808bd3)Coal has been mined in the central Appalachian coalfields of southern West Virginia, western Virginia, and eastern Kentucky for more than a century. The dwindling reserve base consists in large part Jan 1, 2006 
- 
                     Upper Rouge Combined Sewage Overflow Storage and Treatment Tunnel Upper Rouge Combined Sewage Overflow Storage and Treatment TunnelBy F. J. Klingler, K. M. Swaffar, M. M. Rabbaig The Detroit Water and Sewerage Department has undertaken a $1.2 billion effort to capture and treat combined sewage overflows from various outfalls along the Detroit and Rouge Rivers in Detroit, Michi Jan 1, 1999 
- 
                     Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered Headings Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered HeadingsBy Lyman File This paper discusses the overall challenges to construct a two-lane highway tunnel located in southwestern Colorado on U.S. Highway 160 for the Colorado Department of Transportation by the Kiewit West Jan 1, 2003 
- 
                     Engineering Geology Of Betze/Post Pit Eureka County, Nevada, USA Engineering Geology Of Betze/Post Pit Eureka County, Nevada, USABy M. R. Smith Barrick Goldstrike Inc.'s Betze/Post Open Pit is located at the north end of the Carlin Trend, in Eureka County, Nevada, U.S.A. (see location Map, Figure 1). About ten open pit gold mines exist o Jan 1, 1993 
- 
                     Tunnel Lining Pressures During Groundwater Freezing And Thawing Tunnel Lining Pressures During Groundwater Freezing And ThawingBy P. F. R. Altounyan, I. W. Farmer Groundwater freezing was used to stabilise 8m thick beds of saturated and weakly cemented sands at a depth of 170m, during driving of twin 1 in 4,5.2m o.d. circular drifts from the surface to the Coal Jan 1, 1981 
- 
                     Analysis of raise boring with grouting as an optimal method for ore pass construction in incompetent rock mass - A case study Analysis of raise boring with grouting as an optimal method for ore pass construction in incompetent rock mass - A case studyBy Wedam Nyaaba, Edward Wellman, Angelina Anani, Eduardo Cordova, Sefiu O, Cluber Rojas, Adewuyi This study aims to investigate the optimal method for ore pass construction in incompetent rock masses. We evaluated the conventional and raise boring methods based on safety, efficiency, excavation c Dec 1, 2024 
- 
                     South Interceptor Tunnel Construction Using a Lovat EPBM South Interceptor Tunnel Construction Using a Lovat EPBMBy Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja Jan 1, 2003 
- 
                     Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, OhioBy Thomas Sisley, Jozef Zurawski, Richard Switalski Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sew Jan 1, 1997 
- 
                     Improvements On Blasting Technique For Headrace Tunnels Improvements On Blasting Technique For Headrace TunnelsBy Yoneji Kanoh, Masahiko Ohtsuka In Japanese tunneling history, it has commonly been accepted that the long-round driving is difficult due to the complicated geological condition. Therefore, the maximum past record has been less than Jan 1, 1983 
- 
                     Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine Open Pit TBM Driven Drainage Tunnel?Ok Tedi MineBy Tony Peach Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost 
- 
                     TARP — The Des Plaines Tunnel System (North Leg) A Case History TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7 Jan 1, 1997 
- 
                     Economy Version Of Small Diameter Rock Boring Economy Version Of Small Diameter Rock BoringBy Daniel Connor, O&apos The Cal-Sag Relief Sewer is a 2.6 m (8 ft 6 in.) diameter 9.1 km (5.7 mile) rock tunnel bored in dolomite for the Metropolitan Sanitary District of Greater Chicago. Included in the project are 18 shaf Jan 1, 1985 
- 
                     Design of the High Capacity, Horizontally Curved Overland Conveyor at Batu Hijau Design of the High Capacity, Horizontally Curved Overland Conveyor at Batu HijauBy Philip K. Chan Batu Hijau is a new copper and gold mine located on the island of Sumbawa in the Republic of Indonesia. This paper details the design and construction of the Batu Hijau overland conveyor, one of the m Jan 1, 2000 
- 
                     Bucket Wheel Excavator Technology For Mining Lignite In Texas Bucket Wheel Excavator Technology For Mining Lignite In TexasBy Karl J. Benecke Though the first patent on a bucket wheel excavator was granted in 1881 in the U.S. this technology was developed in Germany to the high standards of today. However, this development was only possible Jan 1, 1977 
- 
                     The Role Of The State Of The Art Geology In Discoveries In Poland The Role Of The State Of The Art Geology In Discoveries In PolandBy M. Niec Poland lies at the junction of three geologic provinces: the East European Precambrian platform, the Middle European Paleozoic platform, and the Alpine orogenic belt comprising the Carpathian Mountain Jan 1, 1996 
- 
                     Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AK Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AKBy Jason Morrison The Norwegian Lake Tap Method was successfully used to tap into the side of Lake Dorothy 36.5 m (120') below the lake surface. The lake tap allows water to flowinto an access tunnel from the lake 
