Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Shaft MachinesBy W. R. Dengler
INTRODUCTION Shaft sinking represents a relatively small proportion of the activities involved in mine development. Because of this limited utilization, shaft sinking has been one of the most diffi
Jan 1, 1982
-
Economics Of The Treatment Of Gold Plant Tailings In High Rate ThickenersBy N. D. Jagger, I. M. Arbuthnot
Introduction Over the last five years, a large number of small- to medium-sized carbon-in-pulp treatment plants have been built in Australia, most designed to treat between 250,000 t/a and 1.5 Mt/a
Jan 1, 1993
-
Design of a Laboratory Scale Wind Tunnel for Studying of Mine FiresBy K. D. Luxbacher, J. T. Davis
"A wind tunnel was designed to examine air flow, heat transfer and layering near an active fire at a working face. This tunnel simulates an active entry in an underground coal mine including an attach
Jan 1, 2017
-
Teamwork, Technology Key in Rescuing Coal MinersBy Steve Kral
The dramatic rescue of nine Pennsylvania coal miners trapped nearly 90 m (300 ft) underground for77 hours probably would not have happened without the high technology equipment and improved mine rescu
Jan 1, 2002
-
Hurtières Tunnel Geological HazardBy Hingant Pierre
The Hurtières Tunnel was built in 1995 with drill and blast method, in metamorphic schist. It is located between Lyon and Torino on the A 43 motorway in the French Alps. During the construction, a geo
Jan 1, 1999
-
Underground Mining Methods In Western CanadaBy David M. Parkes
Geology is frequently complicated, hence only more regular deposits are mined. Coal is generally thick, often steeply pitching and usually soft or well-cleated. Due to competition from open-pit mines
Jan 1, 1982
-
Construction of the East-West Cross Drift Tunnel at the Yucca Mountain SiteBy Brian Fulcher, John Eastlund, J. B. Copeland
Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro
Jan 1, 1999
-
The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway TunnelsBy Jens Classen, Thomas Kurth, Karl G. Holter
High performance sprayed concrete equipment installed on two 9.4 m diameter hard rock TBMs enabled a continuous sprayed concrete lining for the entire contour in both tunnels to be performed concurren
Jan 1, 2003
-
Measurement And Simulation Of Face Ventilation Effectiveness For Large Diesel Powered Equipment (3a087281-c2fc-4d07-aec1-494daa617bd2)By Carl E. Brechtel, Edward D. Thimons
Providing adequate airflow to effectively dilute and remove diesel pollutants in large mine working headings is a little researched area. A simulated diesel mucking operation was carried out in the Ex
Jan 1, 1987
-
Pyrrhotite Flotation and its Selectivity Against Pentlandite in the Beneficiation of Nickeliferous Ores: An Electrochemistry PerspectiveBy H. R. Manouchehri
"Pyrrhotite (Po) is one of the most abundant sulfide minerals in processing industry and must be rejected in most cases. Particularly, Po rejection and its selectivity against pentlandite (Pn) have lo
Jan 1, 2015
-
Nordberg MP1000 versus 2 m (7 ft) SHD Symons cone crusher: Performance comparisonBy V. K. Karra
Based on extensive investigations on the effect of design variables on process performance from 1982-85, Nordberg developed a 746 kW (1000 hp) cone crusher with the objective of boosting crushing prod
Jan 1, 1990
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM SolutionsBy Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016
-
Ventilating A Long, Deep-Level Exploration DriftBy John R. Marks
In April 1990, the Homestake Gold Mine embarked on a five year, $US 23 million underground drifting and drilling program to explore promising ore targets north of the current mine. This paper describe
Jan 1, 1991
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Inductive Effect Of Polar Groups On C-H And C-F Stretching Vibrations Of Alkyl And Perfluoroalkyl Groups And Its Relation To AdsorptionBy S. Usui
In a previous article1 the methyl stretching vibrations for a series of xanthates and amines were reported, and the frequency of the methyl stretching vibrations in a homologous series of the alkyl co
Jan 1, 1971
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
Robbins Double Shield Breaks Through On Sochi ProjectIn early March 2011, a 6.2 m (20.3 ft) diameter Rob-bins Double Shield tunnel boring machine (TBM) crossed the finish line in Sochi, Russia. The machine completed a 4.5-km- (2.8-mile-) long section o
Jan 1, 2011
-
Design And Construction Of The Lenihan DAM Outlet Tunnel And ShaftBy Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
Slope Stabilization At El Cerrejon Coal Mine, Colombia, South AmericaBy M. Jaramillo
The expanded west pit of the 15 Mta (13.6 stpy) El Cerrejon mine will eventually reach a maximum depth of 270 m (890 ft). Slope-stability evaluations indicated that this depth, combined with structura
Jan 1, 1997
-
Construction of the Cowles Mountain TunnelBy George K. Mitteer
The Cowles Mountain Tunnel was driven 2,073 m (6,800 ft) with a 3.43 m (11 ft 3 in) shuffle shoe TBM, for the San Diego County Water Authority, through extremely high strength granitic rock in the Cit
Jan 1, 1995